Kitchen electrics need a registered electrician
A kitchen refit usually means new dedicated circuits for higher-draw appliances (oven, hob, dishwasher) rather than sharing a ring main, plus RCD protection near the sink — this is notifiable work under Part P. If your kitchen fitter isn't a registered electrician themselves, ask who handles this part and whether they're NICEIC or NAPIT registered.
Planning kitchen storage during a refit
Pull-out larders, corner carousel units, and drawer-based (rather than cupboard-based) storage all make better use of available space than standard cupboards, but need planning into the layout from the start rather than added afterwards. Worth discussing storage needs before finalising unit choices.
Kitchen layout, the "working triangle" and beyond
The traditional advice is to keep the sink, hob and fridge in an efficient triangle so you're not crossing the kitchen constantly while cooking — still a useful starting point, though open-plan and island layouts sometimes work better with a different logic. Worth discussing how you actually use a kitchen day to day, not just the theory.
Adding a kitchen island, what to consider
An island needs enough surrounding clearance to be usable (not just fit), and if it includes a sink or hob, plumbing and electrics need to reach it — often via the floor, which is far easier to plan during a full refit than retrofit into an existing floor later.
Making corner units actually usable
A standard corner cabinet often wastes significant depth unless fitted with a proper carousel or pull-out mechanism — worth specifying this upfront rather than accepting a basic corner unit by default, since retrofitting a carousel mechanism later usually isn't practical.
Kitchens as part of a wider extension
A kitchen fitted as part of a house extension needs closer coordination between the builder and kitchen fitter on timing — services (electrics, plumbing, ventilation ducting) need to be roughed in during the build phase, before the kitchen fitter's own first-fix stage begins.
What a good kitchen quote should include
A proper quote should specify unit and worktop brand/spec (not just "units, worktop"), whether appliances are supplied or just fitted, whether electrical and plumbing work is covered directly or subcontracted, and what happens if hidden issues are found once old units are removed.
Three steps to hiring the right kitchen fitter
First, ask to see photos of similar completed jobs. Second, clarify exactly who handles the electrical and plumbing work. Third, get a written quote that separates units, worktop, appliances and labour, so you can see where the money's actually going.