Driveway drainage regulations
Since 2008, planning permission is needed for a new or replacement driveway over 5 square metres using non-permeable material unless the water is directed to a permeable area (like a lawn) rather than the road. Permeable options (block paving with permeable jointing, gravel, resin bound) avoid this requirement — worth checking with your installer before committing to material.
Common driveway and paving jobs
Driveway specialists cover new driveway installation (block paving, tarmac, resin, gravel), resurfacing an existing driveway, paths, and kerb dropping to create vehicle access from a road. Repairs to cracked or sunken sections are usually a smaller, separate job from a full installation.
What affects the cost
Cost depends on material, driveway size, ground condition (excavation and disposal if the existing surface needs removing), drainage requirements, and access for machinery and material delivery. A driveway on a slope or with poor existing drainage costs more due to the groundwork involved, not just the surface material.
Why base depth matters more than the surface
The sub-base layer beneath a driveway (typically compacted hardcore) does most of the structural work of supporting vehicle weight without sinking or cracking — a driveway that fails prematurely has very often had an inadequate base depth, regardless of how good the visible surface material was.
Planning for EV charging during driveway work
If you might install an EV charger in future, it's worth having ducting laid during driveway groundwork even if the charger itself comes later — running a cable duct under a finished surface afterwards is a much bigger, more disruptive job than including it during the original installation.
Common driveway myths, busted
"Tarmac is always cheaper than block paving overall" — true for material cost, but lifespan and repairability differ, affecting long-term value. "Resin driveways never need any maintenance" — they still benefit from occasional cleaning and moss treatment. "Any surface can go straight over an old driveway" — base condition often needs assessing regardless of what's visible on top.
Best time of year for driveway installation
Tarmac and resin installation generally prefer drier, milder conditions for proper curing — many installers have a quieter season in deep winter, which can sometimes mean better availability and slightly better pricing, though weather delays are more likely too.
What a good driveway quote should include
A proper quote should specify material and base depth/preparation (not just "block paving" or "tarmac"), whether excavation and disposal of the old surface is included, drainage provision, and edging details. Base preparation quality affects the driveway's lifespan more than most people expect.