How many quotes should you get?
Three is the usual recommendation — enough to spot an outlier (too cheap or too expensive) without asking so many tradespeople to survey your property that it wastes everyone's time. Make sure each quote is for the same scope of work, since a lower price sometimes just means less is included.
How electrician quotes work
Describe the job, including property type, access, and whether the work is notifiable if you know. Electricians use this to give an initial estimate, then confirm the final price after seeing the job in person — particularly for anything involving old wiring, where the scope can change once cables are exposed.
New build and extension electrical work
Wiring an extension or new build from scratch is different from rewiring an existing room — it's planned around final wall positions and fittings before plastering, so timing with your builder matters. First-fix electrical work (cabling inside walls) has to happen before plastering; second-fix (sockets, switches, fittings) after.
Electrical upgrades: EV chargers, solar PV & smart home systems
Beyond repairs, many electricians now fit EV charging points, solar PV inverters and battery storage, and smart home systems — app-controlled lighting, heating and security. These jobs usually need a separate circuit and, for EV chargers, a dedicated consumer unit way — worth checking your existing setup can support the extra load before booking.
Three steps to hiring the right electrician
First, confirm they're registered with NICEIC or NAPIT and ask to see their registration number. Second, get a written quote that itemises labour and materials separately, not just a total. Third, ask what certificate you'll receive when the work's done — for notifiable work, you're entitled to a Building Regulations compliance certificate.
Electrical adaptations for accessibility
Lowering socket heights, adding lighting controls that don't need fine dexterity, and wiring in advance for a stairlift or hoist are common accessibility adaptations. Planning the electrical work alongside any wider accessibility renovation avoids re-opening walls or floors that were only just closed up.
Outdoor and garden electrics
Outdoor sockets, garden lighting, and supplies to sheds or outbuildings need weatherproof (IP-rated) fittings and their own RCD protection — standard indoor sockets and cabling aren't rated for outdoor use. This is notifiable work under Part P if it involves a new circuit.
Solar panels and battery storage wiring
Solar PV and battery storage installation is specialist work, usually done by an MCS-certified installer rather than a general electrician, and needs its own isolation switches and a compliant connection to your consumer unit. Your energy supplier and network operator also need to be notified before or after installation, depending on system size.