What affects the cost
Cost depends on roof size and pitch (steeper roofs need more scaffolding and take longer), the material (slate costs more than concrete tile), access, and whether the existing roof structure (timbers, felt) needs work too, not just the visible covering. A straightforward repair is quick; a full re-roof including scaffolding commonly takes 1-3 weeks.
Signs your roof needs attention
Slipped, cracked or missing tiles, sagging in the roofline, daylight visible through the roof from the loft, and damp patches on ceilings are all signs worth having checked. A few slipped tiles is usually a repair; sagging or widespread wear across the whole roof usually points toward a full re-roof being better value than repeated repairs.
Common roofing jobs
Roofers handle full re-roofs, repairs to individual slipped or cracked tiles, flat roof replacement, guttering, fascias and soffits, and leadwork around chimneys and roof valleys. Emergency work — storm damage, a leak during heavy rain — is usually handled separately from planned re-roofing.
Roofing considerations before fitting solar panels
If a roof needs re-covering within the next 5-10 years, it's usually more cost-effective to do that before fitting solar panels rather than after, since removing and refitting panels for a later re-roof adds cost. Worth asking a roofer to assess roof condition before committing to solar installation timing.
Roofing emergencies — what to do
For a leak during a storm, contain the water inside (a bucket, moving belongings) rather than attempting a repair on a wet or high-wind roof yourself. Photograph any visible damage from the ground for an insurance claim before it's repaired. Tarping over a damaged section is a common temporary fix while a full repair is arranged.
Understanding the labour vs materials split
Materials (tiles, felt, leadwork, scaffolding hire) are often a smaller share of a re-roof quote than labour, particularly given the time and access involved. A cheap quote is worth checking for the same tile/material spec as competing quotes, not just a lower labour day rate.
Skylights and roof windows
Adding a skylight to an existing roof means cutting into the structure and properly flashing around the new opening — a common source of future leaks if not done to the window manufacturer's fitting instructions exactly. Existing roof pitch and rafter spacing affect what size window can go where.
Chimney repairs and rebuilds
A leaning or spalling (crumbling brick) chimney is a structural safety issue, not just cosmetic — some roofers handle chimney repointing and rebuilding themselves, others work alongside a bricklayer. If the chimney is still in use for a flue, check whether it needs to stay swept and functional during the work.