Common roofing jobs
Roofers handle full re-roofs, repairs to individual slipped or cracked tiles, flat roof replacement, guttering, fascias and soffits, and leadwork around chimneys and roof valleys. Emergency work — storm damage, a leak during heavy rain — is usually handled separately from planned re-roofing.
Thatched roofs — a specialist trade
Thatched roofing is its own specialism, not something a general roofer typically covers — thatch has different fire safety, insurance and maintenance considerations (including regular ridge and ongoing coating work) compared to tiled or slated roofs.
Signs your roof needs attention
Slipped, cracked or missing tiles, sagging in the roofline, daylight visible through the roof from the loft, and damp patches on ceilings are all signs worth having checked. A few slipped tiles is usually a repair; sagging or widespread wear across the whole roof usually points toward a full re-roof being better value than repeated repairs.
Why roofing work is weather-dependent
Roofers generally can't safely work in high winds, heavy rain, or icy conditions, so scheduled roofing jobs sometimes shift by a few days around bad weather — factor this into timing if you need work finished by a specific date, particularly in autumn/winter.
Seasonal roof checks worth doing
Before winter: check for loose tiles and clear gutters, since blocked gutters and ice are a common combination for damage. After a storm: a visual check from the ground for obvious damage, before assuming everything's fine just because there's no visible leak yet.
Roofing emergencies — what to do
For a leak during a storm, contain the water inside (a bucket, moving belongings) rather than attempting a repair on a wet or high-wind roof yourself. Photograph any visible damage from the ground for an insurance claim before it's repaired. Tarping over a damaged section is a common temporary fix while a full repair is arranged.
Domestic vs commercial roofing work
Most roofers who work on homes also cover garages, outbuildings and small extensions, but larger commercial flat-roof work (warehouses, larger extensions) sometimes needs a roofer with specific experience in bigger membrane systems. Worth asking directly if your job is unusually large or non-standard.
What affects the cost
Cost depends on roof size and pitch (steeper roofs need more scaffolding and take longer), the material (slate costs more than concrete tile), access, and whether the existing roof structure (timbers, felt) needs work too, not just the visible covering. A straightforward repair is quick; a full re-roof including scaffolding commonly takes 1-3 weeks.