Tripping fuses or flickering lights? Common causes
A breaker that trips repeatedly usually means a fault on a specific circuit, not the consumer unit itself — an electrician can isolate which circuit is affected. Flickering lights are often a loose connection rather than a faulty bulb, and worth having checked rather than ignored, particularly in older wiring.
Rewiring a listed or period property
Listed building consent can be needed for chasing cable runs into original plaster or masonry, even though the electrical work itself is assessed the same way as any other property under Part P. Conduit and surface-mounted cabling are sometimes used instead of chasing into walls specifically to avoid this — worth discussing with an electrician who's worked on listed properties before.
Common electrical myths, busted
"If it's not broken, the wiring's fine" — wiring can be dangerous long before it visibly fails. "Any handyman can do electrics if it's small" — scope, not size, determines whether work is notifiable. "A tripped RCD means the RCD is faulty" — usually it means something else on that circuit is, and the RCD is working as intended.
How often should wiring be tested?
The IET recommends an electrical inspection every 10 years for an owner-occupied home, 5 years for a rented property, and on change of occupancy for some property types. A periodic inspection is different from routine maintenance — it's a formal check against current wiring regulations, not just a visual look.
How long does electrical work take?
A socket or switch swap is usually under an hour. A consumer unit replacement is typically a full day, often with the power off for several hours. A full rewire in an occupied property commonly takes 5 to 10 days depending on size and access, plus time afterwards for plastering and redecorating that isn't part of the electrical work itself.
What a good electrical quote should include
A proper quote should state the scope of work, whether it's notifiable under Part P, an itemised breakdown of labour vs materials, the certificate you'll receive on completion, and how long the job is expected to take. If a quote is missing any of these, ask before agreeing to the work.
How many quotes should you get?
Three is the usual recommendation — enough to spot an outlier (too cheap or too expensive) without asking so many tradespeople to survey your property that it wastes everyone's time. Make sure each quote is for the same scope of work, since a lower price sometimes just means less is included.
Electrical upgrades: EV chargers, solar PV & smart home systems
Beyond repairs, many electricians now fit EV charging points, solar PV inverters and battery storage, and smart home systems — app-controlled lighting, heating and security. These jobs usually need a separate circuit and, for EV chargers, a dedicated consumer unit way — worth checking your existing setup can support the extra load before booking.