Understanding the labour vs materials split
Materials (tiles, felt, leadwork, scaffolding hire) are often a smaller share of a re-roof quote than labour, particularly given the time and access involved. A cheap quote is worth checking for the same tile/material spec as competing quotes, not just a lower labour day rate.
Slate, tile and other roofing materials
Natural slate is durable and often required on period or listed properties for appearance reasons, but costs more than concrete or clay tile. Metal (zinc) roofing suits modern extensions and flat/low-pitch areas. The right material often depends as much on the property's style and any planning restrictions as personal preference.
Chimney repairs and rebuilds
A leaning or spalling (crumbling brick) chimney is a structural safety issue, not just cosmetic — some roofers handle chimney repointing and rebuilding themselves, others work alongside a bricklayer. If the chimney is still in use for a flue, check whether it needs to stay swept and functional during the work.
How long does roofing work take?
A small tile repair is usually a few hours. A full re-roof on an average semi-detached house commonly takes 1-2 weeks including scaffolding, weather permitting — roofing work is one of the more weather-dependent trades, so timelines can shift.
Roofing on extensions and new builds
A new roof needs to tie into the existing structure correctly at the junction — a common source of leaks on extensions is poor detailing at exactly this point, not the new roof covering itself. Timing roofing work before internal trades start avoids water damage to work done underneath.
Signs your roof needs attention
Slipped, cracked or missing tiles, sagging in the roofline, daylight visible through the roof from the loft, and damp patches on ceilings are all signs worth having checked. A few slipped tiles is usually a repair; sagging or widespread wear across the whole roof usually points toward a full re-roof being better value than repeated repairs.
Roofing felt vs breathable membrane
Older roofs often used bituminous felt underneath the tiles, which can perish and needs replacing during a re-roof; modern breathable membrane lasts longer and manages moisture better. If you're having a full re-roof, this underlay is worth confirming as part of the spec, not just the visible tiles.
Common roofing jobs
Roofers handle full re-roofs, repairs to individual slipped or cracked tiles, flat roof replacement, guttering, fascias and soffits, and leadwork around chimneys and roof valleys. Emergency work — storm damage, a leak during heavy rain — is usually handled separately from planned re-roofing.