Kitchen electrics need a registered electrician
A kitchen refit usually means new dedicated circuits for higher-draw appliances (oven, hob, dishwasher) rather than sharing a ring main, plus RCD protection near the sink — this is notifiable work under Part P. If your kitchen fitter isn't a registered electrician themselves, ask who handles this part and whether they're NICEIC or NAPIT registered.
Kitchen lighting layers
A well-lit kitchen usually combines general ceiling lighting, task lighting (under-cabinet lights over worktops, where most food prep happens), and sometimes accent lighting — a single central ceiling light alone often leaves worktops in shadow. Worth planning lighting circuits before, not after, unit installation.
Planning bin storage properly
Built-in pull-out bin drawers, sized for recycling separation, are far easier to plan into a layout during a refit than to add afterwards — worth deciding on bin capacity and separation needs (general waste, recycling, food waste) before cabinet layout is finalised, not after.
Common kitchen fitting jobs
Kitchen fitters handle everything from a single worktop or cupboard door replacement to a full gut-and-refit: removing old units, fitting new cabinetry, worktops, and coordinating the plumbing and electrical work a kitchen needs (sink, dishwasher, oven, extractor). Many fitters manage the whole job and bring in a plumber or electrician for specific parts.
Planning a kitchen-diner layout
Combining kitchen and dining space needs enough clearance around both the cooking area and the table for comfortable movement, and often benefits from a slightly different lighting and ventilation plan than a standalone kitchen — worth discussing how the space will be used for both cooking and eating before finalising layout.
Sizing appliances to your household
An oversized fridge-freezer or dishwasher costs more to buy and run than one properly sized to household needs, while an undersized one means more frequent shopping trips or wash cycles. Worth discussing realistic household size and habits with your fitter rather than defaulting to the largest option that fits.
Choosing a kitchen sink and tap
A single, larger bowl is often more practical than a traditional 1.5 bowl for modern dishwasher-owning households. A boiling water tap adds real convenience but needs a dedicated under-sink unit and its own electrical supply — worth deciding early if you want one, since it affects the plumbing and electrical first-fix.
Knocking through for an open-plan kitchen
Removing a wall between a kitchen and adjoining room to create an open-plan space is a structural job, not just a kitchen fitting one — it needs a structural engineer's assessment and, if the wall is load-bearing, a supporting beam, plus building control sign-off. This is usually coordinated with, not done by, the kitchen fitter directly.