What a roof survey actually checks
A proper roof survey looks beyond the visible tiles — timber condition in the loft, flashing around chimneys and valleys, ventilation, and signs of past repairs. Worth requesting one before buying a property with an older roof, since problems aren't always visible from ground level or even from inside the loft.
Red flags in a cheap roofing quote
A quote well below others, unsolicited doorstep cold-calling (especially "I noticed a problem while working nearby"), demands for cash up front before any work starts, and no fixed business address are all worth treating with caution — roofing is a trade with a higher-than-average scam rate.
Guttering and fascias, when to replace
Guttering that overflows in heavy rain, sags, or has visible cracks is worth replacing before it causes damp at the roofline or foundations. uPVC is the common low-maintenance choice; timber fascias on older properties need repainting periodically or replacing with uPVC to reduce upkeep.
Pest and vermin entry points in roofs
Gaps around fascias, damaged soffit vents, or missing tiles are common entry points for birds, squirrels and other vermin into a loft space — a roofer doing repair work will often flag these even if they weren't the original reason for the call-out.
How roofing quotes work
An initial estimate can be given from photos or a description, but a firm price for anything beyond a very small repair usually needs the roofer to inspect the roof in person, often from the ground with binoculars or a drone rather than climbing up for a quote visit.
Leadwork around chimneys and valleys
Lead flashing seals the joins where a roof meets a chimney, wall, or valley — a very common source of leaks when it perishes or is poorly installed, even if the roof tiles themselves are fine. If a leak keeps recurring in the same spot near a chimney, it's often the leadwork rather than the tiles that needs attention.
How long does roofing work take?
A small tile repair is usually a few hours. A full re-roof on an average semi-detached house commonly takes 1-2 weeks including scaffolding, weather permitting — roofing work is one of the more weather-dependent trades, so timelines can shift.
Common roofing jobs
Roofers handle full re-roofs, repairs to individual slipped or cracked tiles, flat roof replacement, guttering, fascias and soffits, and leadwork around chimneys and roof valleys. Emergency work — storm damage, a leak during heavy rain — is usually handled separately from planned re-roofing.