Electrical upgrades: EV chargers, solar PV & smart home systems
Beyond repairs, many electricians now fit EV charging points, solar PV inverters and battery storage, and smart home systems — app-controlled lighting, heating and security. These jobs usually need a separate circuit and, for EV chargers, a dedicated consumer unit way — worth checking your existing setup can support the extra load before booking.
Electrical adaptations for accessibility
Lowering socket heights, adding lighting controls that don't need fine dexterity, and wiring in advance for a stairlift or hoist are common accessibility adaptations. Planning the electrical work alongside any wider accessibility renovation avoids re-opening walls or floors that were only just closed up.
Rewiring a listed or period property
Listed building consent can be needed for chasing cable runs into original plaster or masonry, even though the electrical work itself is assessed the same way as any other property under Part P. Conduit and surface-mounted cabling are sometimes used instead of chasing into walls specifically to avoid this — worth discussing with an electrician who's worked on listed properties before.
Three steps to hiring the right electrician
First, confirm they're registered with NICEIC or NAPIT and ask to see their registration number. Second, get a written quote that itemises labour and materials separately, not just a total. Third, ask what certificate you'll receive when the work's done — for notifiable work, you're entitled to a Building Regulations compliance certificate.
How long does electrical work take?
A socket or switch swap is usually under an hour. A consumer unit replacement is typically a full day, often with the power off for several hours. A full rewire in an occupied property commonly takes 5 to 10 days depending on size and access, plus time afterwards for plastering and redecorating that isn't part of the electrical work itself.
Electrics in bathrooms — zone rules explained
UK wiring regulations split a bathroom into zones (0, 1, 2, and outside zones) based on distance from water, and each zone restricts what can be fitted and to what IP (ingress protection) rating. A standard socket can't go in zone 1, for example. This is why bathroom electrical work is notifiable under Part P — it's assessed against these zones, not just wired like any other room.
Electrical regulations and legal requirements, FAQ
Do I need a certificate for a new socket? Only if it's part of notifiable work such as a new circuit. Can I do my own electrical work? Non-notifiable like-for-like repairs, yes — notifiable work legally needs a registered electrician or council sign-off. What happens if I sell my house without one? It can hold up the sale or affect your buyer's mortgage offer.
Satisfaction and aftercare — support beyond the job
A registered electrician's paperwork doesn't end when the job does — you should receive a Building Regulations compliance certificate (for notifiable work) or an Electrical Installation Certificate, which you'll need if you sell the property or make an insurance claim. Keep this with your household paperwork.