First fix and second fix plumbing
On a new build or extension, "first fix" is running pipework through walls and floors before they're closed up; "second fix" is fitting the visible taps, radiators and appliances once decorating is done. Timing this with other trades on site matters — pipework needs to be pressure-tested before it's covered over, not after.
When plumbing work needs a Gas Safe engineer instead
Plumbers can install and repair most water systems, but any work on a gas appliance or gas pipework — a boiler, a gas fire, a gas hob — is illegal for anyone who isn't on the Gas Safe Register, by law. If a job involves both plumbing and a gas connection (moving a boiler, for example), check whether your plumber is also Gas Safe registered before booking.
What affects the cost
Cost depends on the scope of the job, how accessible the pipework is (under a floor vs behind a wall), whether parts need to be sourced specially, and whether the job is planned or an emergency call-out. A simple tap or valve replacement is usually quick and low-cost; anything requiring pipework to be rerouted, or walls/floors to be opened up, costs more partly because of the making-good work afterwards.
How plumbing quotes work
Describe the job, including whether it's an emergency, a planned repair, or a full installation, and mention access — under a suspended floor is very different from behind fitted units. Plumbers use this for an initial estimate; the final price is usually confirmed once they've seen the fault or the space in person.
Shared water supplies in flats and conversions
In a converted property, check whether your flat has its own independent stopcock and supply, or shares one with other flats via a communal system. A shared supply can mean a repair affects your neighbours too, and sometimes needs freeholder involvement before work starts.
Connecting new kitchen appliances
A new dishwasher or washing machine needs its own isolation valve and a suitable waste connection — if you're changing from an old appliance in a different position, this sometimes means new pipework rather than just reconnecting to the old point.
Copper vs plastic pipework
Copper pipework is the traditional standard and suits exposed runs; plastic (PEX/push-fit) pipework is faster to install and commonly used for pipework buried in walls or floors where copper joints would be harder to check later. Most plumbers use a mix depending on the specific run, not one material throughout.
What's involved in a bathroom refit
A full bathroom refit usually means removing the old suite, checking and often replacing the pipework behind it (since it's rarely accessible again once tiled over), first-fix plumbing before tiling, then second-fix (taps, shower, toilet cistern) once the room is finished. Waterproofing (tanking) around a shower area is a step worth confirming is included, not assumed.