Finding a hidden leak
A leak inside a wall or under a floor isn't always obvious until it shows as a damp patch or a high water bill. Plumbers use damp meters, thermal imaging or (for harder cases) tracer gas to locate a hidden leak without having to open up an entire wall speculatively — worth asking about before agreeing to exploratory work.
When plumbing work needs a Gas Safe engineer instead
Plumbers can install and repair most water systems, but any work on a gas appliance or gas pipework — a boiler, a gas fire, a gas hob — is illegal for anyone who isn't on the Gas Safe Register, by law. If a job involves both plumbing and a gas connection (moving a boiler, for example), check whether your plumber is also Gas Safe registered before booking.
Outside taps and garden plumbing
An outside tap needs its own isolation valve and, in colder areas, either an internal shut-off you can drain down for winter or a proper anti-frost design — a poorly installed one is a common cause of a burst pipe in cold weather. This is separate from the electrical requirements for any pond or irrigation pump also being installed.
Workmanship guarantees on plumbing work
Most registered plumbers offer a workmanship guarantee separate from any manufacturer's warranty on parts like a boiler or a shower unit — commonly 12 months upwards. Ask what's specifically covered: a guarantee on a bathroom refit should cover the plumbing work itself, not just the visible fittings.
How plumbing quotes work
Describe the job, including whether it's an emergency, a planned repair, or a full installation, and mention access — under a suspended floor is very different from behind fitted units. Plumbers use this for an initial estimate; the final price is usually confirmed once they've seen the fault or the space in person.
How long does plumbing work take?
A tap or valve replacement is usually under an hour. A full bathroom refit commonly takes 5 to 10 working days depending on scope, plus time for tiling and decorating that isn't part of the plumbing work itself. A boiler swap is typically a one-day job if it's a straightforward like-for-like replacement.
What's involved in a bathroom refit
A full bathroom refit usually means removing the old suite, checking and often replacing the pipework behind it (since it's rarely accessible again once tiled over), first-fix plumbing before tiling, then second-fix (taps, shower, toilet cistern) once the room is finished. Waterproofing (tanking) around a shower area is a step worth confirming is included, not assumed.
What affects the cost
Cost depends on the scope of the job, how accessible the pipework is (under a floor vs behind a wall), whether parts need to be sourced specially, and whether the job is planned or an emergency call-out. A simple tap or valve replacement is usually quick and low-cost; anything requiring pipework to be rerouted, or walls/floors to be opened up, costs more partly because of the making-good work afterwards.