Signs your roof needs attention
Slipped, cracked or missing tiles, sagging in the roofline, daylight visible through the roof from the loft, and damp patches on ceilings are all signs worth having checked. A few slipped tiles is usually a repair; sagging or widespread wear across the whole roof usually points toward a full re-roof being better value than repeated repairs.
Common roofing jobs
Roofers handle full re-roofs, repairs to individual slipped or cracked tiles, flat roof replacement, guttering, fascias and soffits, and leadwork around chimneys and roof valleys. Emergency work — storm damage, a leak during heavy rain — is usually handled separately from planned re-roofing.
Roofing regulations, FAQ
Do I need planning permission for a new roof? Usually not for like-for-like replacement, but altering the roofline, adding a dormer, or working on a listed building often does. Do I need Building Regulations sign-off? Yes for most re-roofing work involving insulation changes — a competent roofer will handle or advise on this.
Roofing on extensions and new builds
A new roof needs to tie into the existing structure correctly at the junction — a common source of leaks on extensions is poor detailing at exactly this point, not the new roof covering itself. Timing roofing work before internal trades start avoids water damage to work done underneath.
What affects the cost
Cost depends on roof size and pitch (steeper roofs need more scaffolding and take longer), the material (slate costs more than concrete tile), access, and whether the existing roof structure (timbers, felt) needs work too, not just the visible covering. A straightforward repair is quick; a full re-roof including scaffolding commonly takes 1-3 weeks.
Scaffolding — why it's often a separate cost
Scaffolding is frequently quoted separately from the roofing work itself, priced by roof height, access and how long it's needed. For a small repair some roofers use a tower or ladder instead, but anything involving a full re-roof or significant chimney work usually needs full scaffolding for safety and building regulations reasons.
Thatched roofs — a specialist trade
Thatched roofing is its own specialism, not something a general roofer typically covers — thatch has different fire safety, insurance and maintenance considerations (including regular ridge and ongoing coating work) compared to tiled or slated roofs.
Why roofing work is weather-dependent
Roofers generally can't safely work in high winds, heavy rain, or icy conditions, so scheduled roofing jobs sometimes shift by a few days around bad weather — factor this into timing if you need work finished by a specific date, particularly in autumn/winter.