Christmas lights and extension lead safety
Overloading a single socket with extension leads and adaptors, especially outdoors or over the festive period, is one of the more common causes of a winter electrical fault. Outdoor lights need outdoor-rated (IP-rated) connectors, and it's worth having sockets checked before peak season if your property's wiring is older.
Rewiring a listed or period property
Listed building consent can be needed for chasing cable runs into original plaster or masonry, even though the electrical work itself is assessed the same way as any other property under Part P. Conduit and surface-mounted cabling are sometimes used instead of chasing into walls specifically to avoid this — worth discussing with an electrician who's worked on listed properties before.
Solar panels and battery storage wiring
Solar PV and battery storage installation is specialist work, usually done by an MCS-certified installer rather than a general electrician, and needs its own isolation switches and a compliant connection to your consumer unit. Your energy supplier and network operator also need to be notified before or after installation, depending on system size.
Electrical upgrades: EV chargers, solar PV & smart home systems
Beyond repairs, many electricians now fit EV charging points, solar PV inverters and battery storage, and smart home systems — app-controlled lighting, heating and security. These jobs usually need a separate circuit and, for EV chargers, a dedicated consumer unit way — worth checking your existing setup can support the extra load before booking.
Garage and workshop power
Running power to a detached garage or workshop means an armoured cable, usually buried, and its own consumer unit or sub-board with RCD protection at the supply end. If you're planning to run power tools or an EV charger from it, size the supply for that from the start — upgrading later usually means digging the cable run up again.
New build and extension electrical work
Wiring an extension or new build from scratch is different from rewiring an existing room — it's planned around final wall positions and fittings before plastering, so timing with your builder matters. First-fix electrical work (cabling inside walls) has to happen before plastering; second-fix (sockets, switches, fittings) after.
Single phase vs three phase supply
Most UK homes run on a single-phase electricity supply, which is enough for typical household use. Larger properties, workshops, or homes adding multiple EV chargers or heavy machinery sometimes need a three-phase supply instead — this is arranged with the network operator, not just your electrician, and can take weeks.
How electrician quotes work
Describe the job, including property type, access, and whether the work is notifiable if you know. Electricians use this to give an initial estimate, then confirm the final price after seeing the job in person — particularly for anything involving old wiring, where the scope can change once cables are exposed.