What a roof survey actually checks
A proper roof survey looks beyond the visible tiles — timber condition in the loft, flashing around chimneys and valleys, ventilation, and signs of past repairs. Worth requesting one before buying a property with an older roof, since problems aren't always visible from ground level or even from inside the loft.
Roof ventilation, why it matters
Poor roof ventilation can lead to condensation build-up in the loft space, which over time causes timber rot — a factor a roofer will often check during a re-roof, since it's a much cheaper fix to address at that point than as a standalone later repair.
Scaffolding — why it's often a separate cost
Scaffolding is frequently quoted separately from the roofing work itself, priced by roof height, access and how long it's needed. For a small repair some roofers use a tower or ladder instead, but anything involving a full re-roof or significant chimney work usually needs full scaffolding for safety and building regulations reasons.
Roof insulation, where it goes
Loft insulation (laid flat, cheap, effective) is different from insulating the roof slope itself (needed if the loft is being converted into living space). A re-roof is often the most cost-effective time to upgrade roof-level insulation, since the covering is already off.
Background checks and identity verification
Roofing has a higher-than-average rate of doorstep cold-calling scams (particularly after storms), so checking a roofer's trading history, a verifiable business address, and reviews referencing specific local jobs matters more here than for some other trades.
Red flags in a cheap roofing quote
A quote well below others, unsolicited doorstep cold-calling (especially "I noticed a problem while working nearby"), demands for cash up front before any work starts, and no fixed business address are all worth treating with caution — roofing is a trade with a higher-than-average scam rate.
What a good roofing quote should include
A proper quote should specify materials (tile type, felt/underlay grade), whether scaffolding is included or separate, what happens to existing timbers if they're found to be rotten once work starts, and the guarantee length on both materials and workmanship.
Why roofing work is weather-dependent
Roofers generally can't safely work in high winds, heavy rain, or icy conditions, so scheduled roofing jobs sometimes shift by a few days around bad weather — factor this into timing if you need work finished by a specific date, particularly in autumn/winter.