Roofing guarantees, what to check
A workmanship guarantee typically runs 10 years upwards for a full re-roof, separate from any manufacturer's guarantee on the tiles or felt itself. Ask whether the guarantee is insurance-backed (protects you if the roofer goes out of business) — this varies between individual roofers and isn't automatic.
Chimney repairs and rebuilds
A leaning or spalling (crumbling brick) chimney is a structural safety issue, not just cosmetic — some roofers handle chimney repointing and rebuilding themselves, others work alongside a bricklayer. If the chimney is still in use for a flue, check whether it needs to stay swept and functional during the work.
Understanding the labour vs materials split
Materials (tiles, felt, leadwork, scaffolding hire) are often a smaller share of a re-roof quote than labour, particularly given the time and access involved. A cheap quote is worth checking for the same tile/material spec as competing quotes, not just a lower labour day rate.
Roofing regulations, FAQ
Do I need planning permission for a new roof? Usually not for like-for-like replacement, but altering the roofline, adding a dormer, or working on a listed building often does. Do I need Building Regulations sign-off? Yes for most re-roofing work involving insulation changes — a competent roofer will handle or advise on this.
Common roofing jobs
Roofers handle full re-roofs, repairs to individual slipped or cracked tiles, flat roof replacement, guttering, fascias and soffits, and leadwork around chimneys and roof valleys. Emergency work — storm damage, a leak during heavy rain — is usually handled separately from planned re-roofing.
What affects the cost
Cost depends on roof size and pitch (steeper roofs need more scaffolding and take longer), the material (slate costs more than concrete tile), access, and whether the existing roof structure (timbers, felt) needs work too, not just the visible covering. A straightforward repair is quick; a full re-roof including scaffolding commonly takes 1-3 weeks.
Roof ventilation, why it matters
Poor roof ventilation can lead to condensation build-up in the loft space, which over time causes timber rot — a factor a roofer will often check during a re-roof, since it's a much cheaper fix to address at that point than as a standalone later repair.
How long does roofing work take?
A small tile repair is usually a few hours. A full re-roof on an average semi-detached house commonly takes 1-2 weeks including scaffolding, weather permitting — roofing work is one of the more weather-dependent trades, so timelines can shift.