What's involved in a bathroom refit
A full bathroom refit usually means removing the old suite, checking and often replacing the pipework behind it (since it's rarely accessible again once tiled over), first-fix plumbing before tiling, then second-fix (taps, shower, toilet cistern) once the room is finished. Waterproofing (tanking) around a shower area is a step worth confirming is included, not assumed.
Plumbing in older and period properties
Older properties sometimes still have lead or galvanised steel pipework, which can affect both water quality and pressure, and original layouts weren't designed around modern demand for multiple bathrooms. A plumber working on a period property will often check what the existing pipework is made of before quoting for anything beyond a like-for-like repair.
First fix and second fix plumbing
On a new build or extension, "first fix" is running pipework through walls and floors before they're closed up; "second fix" is fitting the visible taps, radiators and appliances once decorating is done. Timing this with other trades on site matters — pipework needs to be pressure-tested before it's covered over, not after.
Plumbing and selling your home
Buyers' solicitors sometimes ask about the age and condition of the boiler and any recent plumbing work, particularly if there's visible evidence of a past leak or repair. Keeping paperwork for any significant plumbing work — a new boiler, a bathroom refit, a burst pipe repair — makes this a much smoother conversation.
Plumbing regulations, FAQ
Do I need a certificate for a new bathroom? There's no single certificate like Part P for electrics, but any work must comply with Water Fittings Regulations, and gas-connected work needs a Gas Safe engineer. Can I do my own plumbing? Straightforward repairs, yes; anything affecting the public water supply (like a new connection) should go through a WaterSafe-approved plumber.
Three steps to hiring the right plumber
First, check they're registered with a WaterSafe scheme (or Gas Safe too, if the job needs it) and ask for the registration number. Second, get a written quote that separates labour from parts. Third, ask what happens if the job uncovers a bigger problem — a good plumber will tell you before continuing, not after.
How long does plumbing work take?
A tap or valve replacement is usually under an hour. A full bathroom refit commonly takes 5 to 10 working days depending on scope, plus time for tiling and decorating that isn't part of the plumbing work itself. A boiler swap is typically a one-day job if it's a straightforward like-for-like replacement.
Do you know where your stopcock is?
Every property has a main stopcock (usually under the kitchen sink, though sometimes in a different location in older or converted properties) that shuts off the water supply. Knowing where it is and checking it turns freely, before you need it in an emergency, is one of the simplest things a homeowner can do.