Three steps to hiring the right roofer
First, check NFRC membership or equivalent trade body registration. Second, ask for photos of similar completed jobs, ideally local ones. Third, clarify what happens if underlying roof timbers turn out to need work once the old covering is removed — a very common mid-job discovery.
Guttering and fascias, when to replace
Guttering that overflows in heavy rain, sags, or has visible cracks is worth replacing before it causes damp at the roofline or foundations. uPVC is the common low-maintenance choice; timber fascias on older properties need repainting periodically or replacing with uPVC to reduce upkeep.
What a roof survey actually checks
A proper roof survey looks beyond the visible tiles — timber condition in the loft, flashing around chimneys and valleys, ventilation, and signs of past repairs. Worth requesting one before buying a property with an older roof, since problems aren't always visible from ground level or even from inside the loft.
How roofing quotes work
An initial estimate can be given from photos or a description, but a firm price for anything beyond a very small repair usually needs the roofer to inspect the roof in person, often from the ground with binoculars or a drone rather than climbing up for a quote visit.
Leadwork around chimneys and valleys
Lead flashing seals the joins where a roof meets a chimney, wall, or valley — a very common source of leaks when it perishes or is poorly installed, even if the roof tiles themselves are fine. If a leak keeps recurring in the same spot near a chimney, it's often the leadwork rather than the tiles that needs attention.
Common roofing myths, busted
"A few loose tiles are always urgent" — sometimes, but not always; a roofer can usually tell you if it can wait for a scheduled visit. "Moss means the roof needs replacing" — not necessarily, see roof cleaning above. "Flat roofs always leak eventually" — modern EPDM/rubber flat roofing lasts decades if properly installed.
Understanding the labour vs materials split
Materials (tiles, felt, leadwork, scaffolding hire) are often a smaller share of a re-roof quote than labour, particularly given the time and access involved. A cheap quote is worth checking for the same tile/material spec as competing quotes, not just a lower labour day rate.
Roofing regulations, FAQ
Do I need planning permission for a new roof? Usually not for like-for-like replacement, but altering the roofline, adding a dormer, or working on a listed building often does. Do I need Building Regulations sign-off? Yes for most re-roofing work involving insulation changes — a competent roofer will handle or advise on this.