Wiring a loft conversion
A loft conversion typically needs new lighting and socket circuits, often a new consumer unit way if the existing one is already at capacity, and mains-wired interlinked smoke alarms are usually required by building control as part of the sign-off, not just recommended.
Electrical upgrades: EV chargers, solar PV & smart home systems
Beyond repairs, many electricians now fit EV charging points, solar PV inverters and battery storage, and smart home systems — app-controlled lighting, heating and security. These jobs usually need a separate circuit and, for EV chargers, a dedicated consumer unit way — worth checking your existing setup can support the extra load before booking.
LED lighting and energy-saving rewires
Swapping halogen downlights for LEDs is usually straightforward, but older dimmer switches often aren't compatible with LED drivers and need replacing alongside the bulbs, or you'll get flickering or a limited dimming range. If you're rewiring a room anyway, it's worth speccing LED-compatible circuits from the start rather than fixing dimmer compatibility later.
Satisfaction and aftercare — support beyond the job
A registered electrician's paperwork doesn't end when the job does — you should receive a Building Regulations compliance certificate (for notifiable work) or an Electrical Installation Certificate, which you'll need if you sell the property or make an insurance claim. Keep this with your household paperwork.
DIY electrical work vs when you need a professional
Under Part P of the Building Regulations, certain electrical work in a home is notifiable — it has to be carried out by a registered electrician who can self-certify it, or separately inspected by your council's building control. New circuits, consumer unit replacements, and any new work in a kitchen or bathroom are notifiable. Like-for-like socket or switch swaps usually aren't.
First fix and second fix, explained
On a rewire or new build, "first fix" is running cables through walls and floors before they're closed up; "second fix" is fitting sockets, switches and light fittings once decorating is done. Getting the timing right with other trades on site avoids cables being covered before they're tested.
Solar panels and battery storage wiring
Solar PV and battery storage installation is specialist work, usually done by an MCS-certified installer rather than a general electrician, and needs its own isolation switches and a compliant connection to your consumer unit. Your energy supplier and network operator also need to be notified before or after installation, depending on system size.
Electrical safety for landlords
Since 2020, landlords in England must have an EICR carried out every 5 years and provide a copy to tenants. Failing to do so can result in a fine of up to £30,000. If an EICR flags unsatisfactory work, it has to be fixed within 28 days or a shorter period the report specifies.