Shared supplies in flats and converted buildings
In a converted property, it's worth checking whether your flat has its own independent consumer unit and meter, or shares a supply with other flats via a landlord's distribution board. Shared supplies can complicate straightforward jobs and sometimes need freeholder permission before any work starts — check this before booking rather than on the day.
First fix and second fix, explained
On a rewire or new build, "first fix" is running cables through walls and floors before they're closed up; "second fix" is fitting sockets, switches and light fittings once decorating is done. Getting the timing right with other trades on site avoids cables being covered before they're tested.
Three steps to hiring the right electrician
First, confirm they're registered with NICEIC or NAPIT and ask to see their registration number. Second, get a written quote that itemises labour and materials separately, not just a total. Third, ask what certificate you'll receive when the work's done — for notifiable work, you're entitled to a Building Regulations compliance certificate.
Understanding the labour vs materials split
Materials — consumer units, cabling, sockets, fittings — are usually a smaller share of an electrical quote than labour, particularly for jobs involving lifting floors or chasing walls. If a quote seems unusually cheap, check whether it's using a lower-spec consumer unit or cabling than a competing quote, not just a lower labour rate.
DIY electrical work vs when you need a professional
Under Part P of the Building Regulations, certain electrical work in a home is notifiable — it has to be carried out by a registered electrician who can self-certify it, or separately inspected by your council's building control. New circuits, consumer unit replacements, and any new work in a kitchen or bathroom are notifiable. Like-for-like socket or switch swaps usually aren't.
Powering a garden office or outbuilding
Running power to a garden office or outbuilding usually means an armoured cable buried below the recommended depth, its own small consumer unit, and RCD protection at the supply end. This is notifiable work and typically needs building control sign-off alongside the electrical certification.
Wiring a loft conversion
A loft conversion typically needs new lighting and socket circuits, often a new consumer unit way if the existing one is already at capacity, and mains-wired interlinked smoke alarms are usually required by building control as part of the sign-off, not just recommended.
NICEIC & NAPIT registration explained
NICEIC and NAPIT are the two largest government-authorised Competent Person Schemes for electrical work in the UK. Joining requires a recognised qualification (City & Guilds 2382, the 18th Edition Wiring Regulations, plus a Level 3 NVQ and City & Guilds 2391 for inspection and testing), and ongoing assessment. A registered electrician can self-certify notifiable work without a separate council inspection.