Copper vs plastic pipework
Copper pipework is the traditional standard and suits exposed runs; plastic (PEX/push-fit) pipework is faster to install and commonly used for pipework buried in walls or floors where copper joints would be harder to check later. Most plumbers use a mix depending on the specific run, not one material throughout.
When a drain camera survey is worth it
For a recurring blockage, tree root ingress, or before buying a property with an older drainage system, a CCTV drain survey shows the actual condition of the pipework rather than guessing from symptoms alone — worth the cost if a blockage keeps coming back despite repeated clearing.
Red flags in a cheap plumbing quote
A quote significantly below the others is worth questioning before accepting — check it specifies the same quality of parts (a boiler make/model, not just "a boiler"), includes making good after any pipework is exposed, and covers testing before the job is signed off as complete.
How plumbing quotes work
Describe the job, including whether it's an emergency, a planned repair, or a full installation, and mention access — under a suspended floor is very different from behind fitted units. Plumbers use this for an initial estimate; the final price is usually confirmed once they've seen the fault or the space in person.
Common plumbing jobs
Plumbers handle everything from a dripping tap to a full bathroom re-pipe: fixing leaks, clearing blocked drains, replacing taps and valves, fitting new bathroom suites, repairing or replacing radiators, and connecting appliances like washing machines and dishwashers. Emergency work (burst pipes, no hot water) is usually handled separately from planned jobs like a bathroom refit.
What a boiler fault code usually means
Modern combi boilers display a fault code when something's wrong rather than just stopping — the exact meaning varies by manufacturer, but common causes behind a "no heat" code include low pressure, a faulty sensor, or an ignition fault. Note the code before calling a plumber; it speeds up diagnosis considerably.
What's involved in a bathroom refit
A full bathroom refit usually means removing the old suite, checking and often replacing the pipework behind it (since it's rarely accessible again once tiled over), first-fix plumbing before tiling, then second-fix (taps, shower, toilet cistern) once the room is finished. Waterproofing (tanking) around a shower area is a step worth confirming is included, not assumed.
First fix and second fix plumbing
On a new build or extension, "first fix" is running pipework through walls and floors before they're closed up; "second fix" is fitting the visible taps, radiators and appliances once decorating is done. Timing this with other trades on site matters — pipework needs to be pressure-tested before it's covered over, not after.