Roofing guarantees, what to check
A workmanship guarantee typically runs 10 years upwards for a full re-roof, separate from any manufacturer's guarantee on the tiles or felt itself. Ask whether the guarantee is insurance-backed (protects you if the roofer goes out of business) — this varies between individual roofers and isn't automatic.
Scaffolding — why it's often a separate cost
Scaffolding is frequently quoted separately from the roofing work itself, priced by roof height, access and how long it's needed. For a small repair some roofers use a tower or ladder instead, but anything involving a full re-roof or significant chimney work usually needs full scaffolding for safety and building regulations reasons.
Leadwork around chimneys and valleys
Lead flashing seals the joins where a roof meets a chimney, wall, or valley — a very common source of leaks when it perishes or is poorly installed, even if the roof tiles themselves are fine. If a leak keeps recurring in the same spot near a chimney, it's often the leadwork rather than the tiles that needs attention.
Roof insulation, where it goes
Loft insulation (laid flat, cheap, effective) is different from insulating the roof slope itself (needed if the loft is being converted into living space). A re-roof is often the most cost-effective time to upgrade roof-level insulation, since the covering is already off.
Roof orientation and solar suitability
A south-facing roof slope generally gets the most useful sun for solar panels, though east/west-facing roofs can still work reasonably well. A roofer or solar installer assessing suitability will look at pitch, orientation, shading from nearby trees or buildings, and roof structural capacity together.
Roofing regulations, FAQ
Do I need planning permission for a new roof? Usually not for like-for-like replacement, but altering the roofline, adding a dormer, or working on a listed building often does. Do I need Building Regulations sign-off? Yes for most re-roofing work involving insulation changes — a competent roofer will handle or advise on this.
What affects the cost
Cost depends on roof size and pitch (steeper roofs need more scaffolding and take longer), the material (slate costs more than concrete tile), access, and whether the existing roof structure (timbers, felt) needs work too, not just the visible covering. A straightforward repair is quick; a full re-roof including scaffolding commonly takes 1-3 weeks.
Signs your roof needs attention
Slipped, cracked or missing tiles, sagging in the roofline, daylight visible through the roof from the loft, and damp patches on ceilings are all signs worth having checked. A few slipped tiles is usually a repair; sagging or widespread wear across the whole roof usually points toward a full re-roof being better value than repeated repairs.