Kitchen electrics need a registered electrician
A kitchen refit usually means new dedicated circuits for higher-draw appliances (oven, hob, dishwasher) rather than sharing a ring main, plus RCD protection near the sink — this is notifiable work under Part P. If your kitchen fitter isn't a registered electrician themselves, ask who handles this part and whether they're NICEIC or NAPIT registered.
Three steps to hiring the right kitchen fitter
First, ask to see photos of similar completed jobs. Second, clarify exactly who handles the electrical and plumbing work. Third, get a written quote that separates units, worktop, appliances and labour, so you can see where the money's actually going.
Knocking through for an open-plan kitchen
Removing a wall between a kitchen and adjoining room to create an open-plan space is a structural job, not just a kitchen fitting one — it needs a structural engineer's assessment and, if the wall is load-bearing, a supporting beam, plus building control sign-off. This is usually coordinated with, not done by, the kitchen fitter directly.
Replacing just the doors and worktop
If existing cabinet carcasses are structurally sound, replacing only the doors and worktop can transform a kitchen's look for significantly less than a full refit — worth asking a fitter to assess carcass condition before assuming a complete replacement is necessary.
Choosing a kitchen sink and tap
A single, larger bowl is often more practical than a traditional 1.5 bowl for modern dishwasher-owning households. A boiling water tap adds real convenience but needs a dedicated under-sink unit and its own electrical supply — worth deciding early if you want one, since it affects the plumbing and electrical first-fix.
How many quotes should you get?
Three is reasonable for most kitchen jobs. For a full refit, make sure each quote specifies the same unit range and worktop material, since kitchen quotes vary enormously based on spec assumptions that aren't always stated clearly upfront.
Planning kitchen storage during a refit
Pull-out larders, corner carousel units, and drawer-based (rather than cupboard-based) storage all make better use of available space than standard cupboards, but need planning into the layout from the start rather than added afterwards. Worth discussing storage needs before finalising unit choices.
Kitchen layout, the "working triangle" and beyond
The traditional advice is to keep the sink, hob and fridge in an efficient triangle so you're not crossing the kitchen constantly while cooking — still a useful starting point, though open-plan and island layouts sometimes work better with a different logic. Worth discussing how you actually use a kitchen day to day, not just the theory.