Single phase vs three phase supply
Most UK homes run on a single-phase electricity supply, which is enough for typical household use. Larger properties, workshops, or homes adding multiple EV chargers or heavy machinery sometimes need a three-phase supply instead — this is arranged with the network operator, not just your electrician, and can take weeks.
Three steps to hiring the right electrician
First, confirm they're registered with NICEIC or NAPIT and ask to see their registration number. Second, get a written quote that itemises labour and materials separately, not just a total. Third, ask what certificate you'll receive when the work's done — for notifiable work, you're entitled to a Building Regulations compliance certificate.
What is an EICR and do I need one?
An Electrical Installation Condition Report checks a property's wiring against current safety standards and flags anything worn, damaged or non-compliant. Landlords are legally required to get one every 5 years; homeowners aren't, but it's worth having on an older property or one you've just bought where the wiring history is unknown.
Electrical safety for landlords
Since 2020, landlords in England must have an EICR carried out every 5 years and provide a copy to tenants. Failing to do so can result in a fine of up to £30,000. If an EICR flags unsatisfactory work, it has to be fixed within 28 days or a shorter period the report specifies.
DIY electrical work vs when you need a professional
Under Part P of the Building Regulations, certain electrical work in a home is notifiable — it has to be carried out by a registered electrician who can self-certify it, or separately inspected by your council's building control. New circuits, consumer unit replacements, and any new work in a kitchen or bathroom are notifiable. Like-for-like socket or switch swaps usually aren't.
New build and extension electrical work
Wiring an extension or new build from scratch is different from rewiring an existing room — it's planned around final wall positions and fittings before plastering, so timing with your builder matters. First-fix electrical work (cabling inside walls) has to happen before plastering; second-fix (sockets, switches, fittings) after.
How long does electrical work take?
A socket or switch swap is usually under an hour. A consumer unit replacement is typically a full day, often with the power off for several hours. A full rewire in an occupied property commonly takes 5 to 10 days depending on size and access, plus time afterwards for plastering and redecorating that isn't part of the electrical work itself.
Electrical safety for holiday lets and Airbnbs
If you let a property short-term, insurers and booking platforms increasingly expect an in-date EICR and PAT-tested appliances, even though it isn't a blanket legal requirement the way it is for standard tenancies. Treat it the same as a rental for safety purposes — guests have less familiarity with the property than an owner-occupier would.