First fix and second fix plumbing
On a new build or extension, "first fix" is running pipework through walls and floors before they're closed up; "second fix" is fitting the visible taps, radiators and appliances once decorating is done. Timing this with other trades on site matters — pipework needs to be pressure-tested before it's covered over, not after.
What's involved in a bathroom refit
A full bathroom refit usually means removing the old suite, checking and often replacing the pipework behind it (since it's rarely accessible again once tiled over), first-fix plumbing before tiling, then second-fix (taps, shower, toilet cistern) once the room is finished. Waterproofing (tanking) around a shower area is a step worth confirming is included, not assumed.
Hard water and your plumbing
In hard water areas, limescale builds up inside pipes, taps, showerheads and boiler heat exchangers over time, gradually reducing efficiency and flow. A plumber working in a hard water area may recommend a water softener or scale inhibitor as part of a boiler installation, particularly for a system that's expected to last 10+ years.
Background checks and identity verification
Before booking, it's worth checking a plumber's trading history and identity, not just their registration — a landline or verifiable business address and reviews referencing specific jobs are stronger signals than a mobile number and a van sign alone.
How many quotes should you get?
Three is a reasonable number for most plumbing jobs — enough to spot an outlier without asking too many people to visit for a straightforward repair. For a planned job like a bathroom refit, make sure each quote covers the same scope, since a lower price sometimes means less is included, not better value.
Protecting pipes in cold weather
Pipes in unheated spaces — lofts, garages, outbuildings — are the most common source of a winter burst pipe once temperatures drop below freezing for a sustained period. Lagging exposed pipework and keeping heating on a low constant setting during a cold snap, rather than off, are the two most effective preventive steps.
How long does plumbing work take?
A tap or valve replacement is usually under an hour. A full bathroom refit commonly takes 5 to 10 working days depending on scope, plus time for tiling and decorating that isn't part of the plumbing work itself. A boiler swap is typically a one-day job if it's a straightforward like-for-like replacement.
What affects the cost
Cost depends on the scope of the job, how accessible the pipework is (under a floor vs behind a wall), whether parts need to be sourced specially, and whether the job is planned or an emergency call-out. A simple tap or valve replacement is usually quick and low-cost; anything requiring pipework to be rerouted, or walls/floors to be opened up, costs more partly because of the making-good work afterwards.