First fix and second fix, explained
On a rewire or new build, "first fix" is running cables through walls and floors before they're closed up; "second fix" is fitting sockets, switches and light fittings once decorating is done. Getting the timing right with other trades on site avoids cables being covered before they're tested.
Three steps to hiring the right electrician
First, confirm they're registered with NICEIC or NAPIT and ask to see their registration number. Second, get a written quote that itemises labour and materials separately, not just a total. Third, ask what certificate you'll receive when the work's done — for notifiable work, you're entitled to a Building Regulations compliance certificate.
How often should wiring be tested?
The IET recommends an electrical inspection every 10 years for an owner-occupied home, 5 years for a rented property, and on change of occupancy for some property types. A periodic inspection is different from routine maintenance — it's a formal check against current wiring regulations, not just a visual look.
Common electrical myths, busted
"If it's not broken, the wiring's fine" — wiring can be dangerous long before it visibly fails. "Any handyman can do electrics if it's small" — scope, not size, determines whether work is notifiable. "A tripped RCD means the RCD is faulty" — usually it means something else on that circuit is, and the RCD is working as intended.
Electrical regulations and legal requirements, FAQ
Do I need a certificate for a new socket? Only if it's part of notifiable work such as a new circuit. Can I do my own electrical work? Non-notifiable like-for-like repairs, yes — notifiable work legally needs a registered electrician or council sign-off. What happens if I sell my house without one? It can hold up the sale or affect your buyer's mortgage offer.
What a good electrical quote should include
A proper quote should state the scope of work, whether it's notifiable under Part P, an itemised breakdown of labour vs materials, the certificate you'll receive on completion, and how long the job is expected to take. If a quote is missing any of these, ask before agreeing to the work.
Rewiring a listed or period property
Listed building consent can be needed for chasing cable runs into original plaster or masonry, even though the electrical work itself is assessed the same way as any other property under Part P. Conduit and surface-mounted cabling are sometimes used instead of chasing into walls specifically to avoid this — worth discussing with an electrician who's worked on listed properties before.
Understanding the labour vs materials split
Materials — consumer units, cabling, sockets, fittings — are usually a smaller share of an electrical quote than labour, particularly for jobs involving lifting floors or chasing walls. If a quote seems unusually cheap, check whether it's using a lower-spec consumer unit or cabling than a competing quote, not just a lower labour rate.