Shared supplies in flats and converted buildings
In a converted property, it's worth checking whether your flat has its own independent consumer unit and meter, or shares a supply with other flats via a landlord's distribution board. Shared supplies can complicate straightforward jobs and sometimes need freeholder permission before any work starts — check this before booking rather than on the day.
Garage and workshop power
Running power to a detached garage or workshop means an armoured cable, usually buried, and its own consumer unit or sub-board with RCD protection at the supply end. If you're planning to run power tools or an EV charger from it, size the supply for that from the start — upgrading later usually means digging the cable run up again.
Electrics in kitchens — circuits for appliances
A kitchen refit usually means new dedicated circuits for higher-draw appliances (oven, hob, dishwasher) rather than sharing a single ring main, plus RCD protection for anywhere near a sink. If you're changing the kitchen layout, plan socket and circuit positions before the units go in — moving them afterwards means lifting worktops or units again.
Electrical emergencies — what to do
If you smell burning, see sparks, or a breaker keeps tripping and won't reset, turn off the affected circuit and call an electrician. Don't reset a tripped breaker more than once if it trips again immediately — that usually means a fault, not a one-off.
Electrical adaptations for accessibility
Lowering socket heights, adding lighting controls that don't need fine dexterity, and wiring in advance for a stairlift or hoist are common accessibility adaptations. Planning the electrical work alongside any wider accessibility renovation avoids re-opening walls or floors that were only just closed up.
What affects the cost
Cost depends on the scope of the job, how much of the property needs to be accessed, the age and condition of the existing wiring, and whether the consumer unit needs upgrading. A single socket replacement is quick and low-cost; a full rewire in an older property takes longer, partly because of the making-good work afterwards.
What a good electrical quote should include
A proper quote should state the scope of work, whether it's notifiable under Part P, an itemised breakdown of labour vs materials, the certificate you'll receive on completion, and how long the job is expected to take. If a quote is missing any of these, ask before agreeing to the work.
Electrical upgrades: EV chargers, solar PV & smart home systems
Beyond repairs, many electricians now fit EV charging points, solar PV inverters and battery storage, and smart home systems — app-controlled lighting, heating and security. These jobs usually need a separate circuit and, for EV chargers, a dedicated consumer unit way — worth checking your existing setup can support the extra load before booking.