How many quotes should you get?
Three is a reasonable number for most plumbing jobs — enough to spot an outlier without asking too many people to visit for a straightforward repair. For a planned job like a bathroom refit, make sure each quote covers the same scope, since a lower price sometimes means less is included, not better value.
Understanding the labour vs materials split
Materials — pipework, fittings, a new boiler or bathroom suite — are often a smaller share of a plumbing quote than labour, particularly for jobs involving lifting floors or chasing walls. If a quote looks unusually cheap, check whether it specifies the same brand/quality of fittings as a competing quote, not just a lower labour rate.
What a boiler fault code usually means
Modern combi boilers display a fault code when something's wrong rather than just stopping — the exact meaning varies by manufacturer, but common causes behind a "no heat" code include low pressure, a faulty sensor, or an ignition fault. Note the code before calling a plumber; it speeds up diagnosis considerably.
Boiler pressure and heating faults
Most combi boilers run best between 1 and 1.5 bar of pressure — too low and the heating cuts out, too high and the pressure relief valve can discharge. A plumber checking a heating fault will usually look at pressure, check for trapped air in radiators (bleeding), and check the pump and diverter valve before assuming a full boiler fault.
How plumbing quotes work
Describe the job, including whether it's an emergency, a planned repair, or a full installation, and mention access — under a suspended floor is very different from behind fitted units. Plumbers use this for an initial estimate; the final price is usually confirmed once they've seen the fault or the space in person.
Three steps to hiring the right plumber
First, check they're registered with a WaterSafe scheme (or Gas Safe too, if the job needs it) and ask for the registration number. Second, get a written quote that separates labour from parts. Third, ask what happens if the job uncovers a bigger problem — a good plumber will tell you before continuing, not after.
First fix and second fix plumbing
On a new build or extension, "first fix" is running pipework through walls and floors before they're closed up; "second fix" is fitting the visible taps, radiators and appliances once decorating is done. Timing this with other trades on site matters — pipework needs to be pressure-tested before it's covered over, not after.
Common toilet and cistern problems
A toilet that runs constantly is usually a worn flush valve or float mechanism inside the cistern — a relatively cheap fix compared to replacing the whole toilet. A slow-filling cistern often points to a partially closed isolation valve or low mains pressure rather than a fault with the toilet itself.