Why an in-person survey matters for kitchens
Walls and floors are rarely perfectly square, especially in older properties, and a survey catches this before units are ordered to a size that won't actually fit cleanly. Skipping a proper survey in favour of a quick estimate is a common cause of on-site problems during fitting.
How kitchen fitting quotes work
Describe the current layout and what's changing — an initial estimate can follow, but a firm price for anything beyond a straightforward like-for-like refit usually needs an in-person visit, since existing plumbing/electrical positions significantly affect cost once work starts.
How many quotes should you get?
Three is reasonable for most kitchen jobs. For a full refit, make sure each quote specifies the same unit range and worktop material, since kitchen quotes vary enormously based on spec assumptions that aren't always stated clearly upfront.
Common kitchen fitting jobs
Kitchen fitters handle everything from a single worktop or cupboard door replacement to a full gut-and-refit: removing old units, fitting new cabinetry, worktops, and coordinating the plumbing and electrical work a kitchen needs (sink, dishwasher, oven, extractor). Many fitters manage the whole job and bring in a plumber or electrician for specific parts.
Three steps to hiring the right kitchen fitter
First, ask to see photos of similar completed jobs. Second, clarify exactly who handles the electrical and plumbing work. Third, get a written quote that separates units, worktop, appliances and labour, so you can see where the money's actually going.
Planning bin storage properly
Built-in pull-out bin drawers, sized for recycling separation, are far easier to plan into a layout during a refit than to add afterwards — worth deciding on bin capacity and separation needs (general waste, recycling, food waste) before cabinet layout is finalised, not after.
Kitchens as part of a wider extension
A kitchen fitted as part of a house extension needs closer coordination between the builder and kitchen fitter on timing — services (electrics, plumbing, ventilation ducting) need to be roughed in during the build phase, before the kitchen fitter's own first-fix stage begins.
Kitchen lighting layers
A well-lit kitchen usually combines general ceiling lighting, task lighting (under-cabinet lights over worktops, where most food prep happens), and sometimes accent lighting — a single central ceiling light alone often leaves worktops in shadow. Worth planning lighting circuits before, not after, unit installation.