Three steps to hiring the right roofer
First, check NFRC membership or equivalent trade body registration. Second, ask for photos of similar completed jobs, ideally local ones. Third, clarify what happens if underlying roof timbers turn out to need work once the old covering is removed — a very common mid-job discovery.
Scaffolding — why it's often a separate cost
Scaffolding is frequently quoted separately from the roofing work itself, priced by roof height, access and how long it's needed. For a small repair some roofers use a tower or ladder instead, but anything involving a full re-roof or significant chimney work usually needs full scaffolding for safety and building regulations reasons.
How roofing quotes work
An initial estimate can be given from photos or a description, but a firm price for anything beyond a very small repair usually needs the roofer to inspect the roof in person, often from the ground with binoculars or a drone rather than climbing up for a quote visit.
Thatched roofs — a specialist trade
Thatched roofing is its own specialism, not something a general roofer typically covers — thatch has different fire safety, insurance and maintenance considerations (including regular ridge and ongoing coating work) compared to tiled or slated roofs.
What affects the cost
Cost depends on roof size and pitch (steeper roofs need more scaffolding and take longer), the material (slate costs more than concrete tile), access, and whether the existing roof structure (timbers, felt) needs work too, not just the visible covering. A straightforward repair is quick; a full re-roof including scaffolding commonly takes 1-3 weeks.
Common roofing jobs
Roofers handle full re-roofs, repairs to individual slipped or cracked tiles, flat roof replacement, guttering, fascias and soffits, and leadwork around chimneys and roof valleys. Emergency work — storm damage, a leak during heavy rain — is usually handled separately from planned re-roofing.
Insurance-backed guarantees, explained
An insurance-backed guarantee protects you if the roofing company goes out of business during the guarantee period — a separate product from the roofer's own workmanship guarantee. Not every roofer offers this; worth asking specifically for larger jobs like a full re-roof.
What a good roofing quote should include
A proper quote should specify materials (tile type, felt/underlay grade), whether scaffolding is included or separate, what happens to existing timbers if they're found to be rotten once work starts, and the guarantee length on both materials and workmanship.