Red flags in a cheap electrical quote
A quote significantly below the others is worth asking about before accepting — check it includes a proper consumer unit (not a budget one that doesn't meet current standards), covers making good afterwards, and includes the certificate you're entitled to for notifiable work. Cash-only, no fixed address, and no registration number are all worth asking about directly.
Single phase vs three phase supply
Most UK homes run on a single-phase electricity supply, which is enough for typical household use. Larger properties, workshops, or homes adding multiple EV chargers or heavy machinery sometimes need a three-phase supply instead — this is arranged with the network operator, not just your electrician, and can take weeks.
Garage and workshop power
Running power to a detached garage or workshop means an armoured cable, usually buried, and its own consumer unit or sub-board with RCD protection at the supply end. If you're planning to run power tools or an EV charger from it, size the supply for that from the start — upgrading later usually means digging the cable run up again.
What a good electrical quote should include
A proper quote should state the scope of work, whether it's notifiable under Part P, an itemised breakdown of labour vs materials, the certificate you'll receive on completion, and how long the job is expected to take. If a quote is missing any of these, ask before agreeing to the work.
New build and extension electrical work
Wiring an extension or new build from scratch is different from rewiring an existing room — it's planned around final wall positions and fittings before plastering, so timing with your builder matters. First-fix electrical work (cabling inside walls) has to happen before plastering; second-fix (sockets, switches, fittings) after.
Electrical work and home insurance
Some insurers ask whether notifiable electrical work has been certified when you make a claim involving fire or electrical damage — keep your Electrical Installation Certificate or Building Regulations compliance certificate somewhere you can find it, not just with the electrician's paperwork.
When does a consumer unit need replacing?
Older fuse boxes with rewireable fuses or plastic (rather than metal) casings don't meet current wiring regulations and are a common reason a rewire quote comes in higher than expected. A modern consumer unit uses RCBOs, which cut power to a single faulty circuit rather than the whole property.
Electrical safety for landlords
Since 2020, landlords in England must have an EICR carried out every 5 years and provide a copy to tenants. Failing to do so can result in a fine of up to £30,000. If an EICR flags unsatisfactory work, it has to be fixed within 28 days or a shorter period the report specifies.