Signs your roof needs attention
Slipped, cracked or missing tiles, sagging in the roofline, daylight visible through the roof from the loft, and damp patches on ceilings are all signs worth having checked. A few slipped tiles is usually a repair; sagging or widespread wear across the whole roof usually points toward a full re-roof being better value than repeated repairs.
Scaffolding — why it's often a separate cost
Scaffolding is frequently quoted separately from the roofing work itself, priced by roof height, access and how long it's needed. For a small repair some roofers use a tower or ladder instead, but anything involving a full re-roof or significant chimney work usually needs full scaffolding for safety and building regulations reasons.
Why roofing work is weather-dependent
Roofers generally can't safely work in high winds, heavy rain, or icy conditions, so scheduled roofing jobs sometimes shift by a few days around bad weather — factor this into timing if you need work finished by a specific date, particularly in autumn/winter.
Slate, tile and other roofing materials
Natural slate is durable and often required on period or listed properties for appearance reasons, but costs more than concrete or clay tile. Metal (zinc) roofing suits modern extensions and flat/low-pitch areas. The right material often depends as much on the property's style and any planning restrictions as personal preference.
What a roof survey actually checks
A proper roof survey looks beyond the visible tiles — timber condition in the loft, flashing around chimneys and valleys, ventilation, and signs of past repairs. Worth requesting one before buying a property with an older roof, since problems aren't always visible from ground level or even from inside the loft.
Roofing regulations, FAQ
Do I need planning permission for a new roof? Usually not for like-for-like replacement, but altering the roofline, adding a dormer, or working on a listed building often does. Do I need Building Regulations sign-off? Yes for most re-roofing work involving insulation changes — a competent roofer will handle or advise on this.
Dormer windows and roofline alterations
A dormer window (as opposed to a flush skylight) changes the roofline itself and almost always needs both planning consideration and Building Regulations sign-off, unlike a straightforward re-roof. This is more involved than most roofing work and often overlaps with loft conversion specialists.
What affects the cost
Cost depends on roof size and pitch (steeper roofs need more scaffolding and take longer), the material (slate costs more than concrete tile), access, and whether the existing roof structure (timbers, felt) needs work too, not just the visible covering. A straightforward repair is quick; a full re-roof including scaffolding commonly takes 1-3 weeks.