Roofing felt vs breathable membrane
Older roofs often used bituminous felt underneath the tiles, which can perish and needs replacing during a re-roof; modern breathable membrane lasts longer and manages moisture better. If you're having a full re-roof, this underlay is worth confirming as part of the spec, not just the visible tiles.
Three steps to hiring the right roofer
First, check NFRC membership or equivalent trade body registration. Second, ask for photos of similar completed jobs, ideally local ones. Third, clarify what happens if underlying roof timbers turn out to need work once the old covering is removed — a very common mid-job discovery.
Insurance-backed guarantees, explained
An insurance-backed guarantee protects you if the roofing company goes out of business during the guarantee period — a separate product from the roofer's own workmanship guarantee. Not every roofer offers this; worth asking specifically for larger jobs like a full re-roof.
Leadwork around chimneys and valleys
Lead flashing seals the joins where a roof meets a chimney, wall, or valley — a very common source of leaks when it perishes or is poorly installed, even if the roof tiles themselves are fine. If a leak keeps recurring in the same spot near a chimney, it's often the leadwork rather than the tiles that needs attention.
Red flags in a cheap roofing quote
A quote well below others, unsolicited doorstep cold-calling (especially "I noticed a problem while working nearby"), demands for cash up front before any work starts, and no fixed business address are all worth treating with caution — roofing is a trade with a higher-than-average scam rate.
What affects the cost
Cost depends on roof size and pitch (steeper roofs need more scaffolding and take longer), the material (slate costs more than concrete tile), access, and whether the existing roof structure (timbers, felt) needs work too, not just the visible covering. A straightforward repair is quick; a full re-roof including scaffolding commonly takes 1-3 weeks.
How many quotes should you get?
Three is reasonable for most roofing jobs. For a full re-roof, make sure each quote specifies the same tile/material and includes or excludes scaffolding consistently — roofing quotes vary more than some trades simply because of what's included or left out.
Common roofing jobs
Roofers handle full re-roofs, repairs to individual slipped or cracked tiles, flat roof replacement, guttering, fascias and soffits, and leadwork around chimneys and roof valleys. Emergency work — storm damage, a leak during heavy rain — is usually handled separately from planned re-roofing.