Leadwork around chimneys and valleys
Lead flashing seals the joins where a roof meets a chimney, wall, or valley — a very common source of leaks when it perishes or is poorly installed, even if the roof tiles themselves are fine. If a leak keeps recurring in the same spot near a chimney, it's often the leadwork rather than the tiles that needs attention.
Gutter clearing vs gutter replacement
Blocked gutters from leaves and debris are usually a clearing job, not a replacement one — worth getting cleared before assuming new guttering is needed. Persistent overflow even when clear, or visible sagging/cracking, points toward the guttering itself needing replacement rather than just clearing.
Red flags in a cheap roofing quote
A quote well below others, unsolicited doorstep cold-calling (especially "I noticed a problem while working nearby"), demands for cash up front before any work starts, and no fixed business address are all worth treating with caution — roofing is a trade with a higher-than-average scam rate.
Roofing on extensions and new builds
A new roof needs to tie into the existing structure correctly at the junction — a common source of leaks on extensions is poor detailing at exactly this point, not the new roof covering itself. Timing roofing work before internal trades start avoids water damage to work done underneath.
Roofing felt vs breathable membrane
Older roofs often used bituminous felt underneath the tiles, which can perish and needs replacing during a re-roof; modern breathable membrane lasts longer and manages moisture better. If you're having a full re-roof, this underlay is worth confirming as part of the spec, not just the visible tiles.
Pest and vermin entry points in roofs
Gaps around fascias, damaged soffit vents, or missing tiles are common entry points for birds, squirrels and other vermin into a loft space — a roofer doing repair work will often flag these even if they weren't the original reason for the call-out.
Chimney repairs and rebuilds
A leaning or spalling (crumbling brick) chimney is a structural safety issue, not just cosmetic — some roofers handle chimney repointing and rebuilding themselves, others work alongside a bricklayer. If the chimney is still in use for a flue, check whether it needs to stay swept and functional during the work.
What affects the cost
Cost depends on roof size and pitch (steeper roofs need more scaffolding and take longer), the material (slate costs more than concrete tile), access, and whether the existing roof structure (timbers, felt) needs work too, not just the visible covering. A straightforward repair is quick; a full re-roof including scaffolding commonly takes 1-3 weeks.