Why an in-person survey matters for kitchens
Walls and floors are rarely perfectly square, especially in older properties, and a survey catches this before units are ordered to a size that won't actually fit cleanly. Skipping a proper survey in favour of a quick estimate is a common cause of on-site problems during fitting.
Kitchen regulations, FAQ
Do I need building control sign-off for a kitchen refit? Usually not for a like-for-like layout, but new electrical circuits need a registered electrician's certification, handled as part of that work. Can I fit my own units? Yes, unit fitting itself isn't regulated — it's the electrics and plumbing behind it that are.
Understanding the labour vs materials split
Units, worktop and appliances are often the largest share of a kitchen's total cost, but fitting labour, old kitchen removal, and making good around new services add up too. A cheap quote is worth checking against the same unit/worktop spec as competing quotes, not just lower labour.
Integrated vs freestanding appliances
Integrated appliances (behind matching cabinet fronts) give a more seamless look but cost more and can be more expensive to replace later since they need to match the specific cabinet dimensions. Freestanding appliances are more flexible and often cheaper, at the cost of a less uniform appearance.
What affects the cost
Cost depends on worktop material (laminate vs stone vs wood), whether the layout is changing (moving plumbing/electrics vs replacing in place), unit quality, and appliance integration. Moving a sink or hob position adds cost beyond the units themselves because of the pipework and electrical work involved.
Planning kitchen storage during a refit
Pull-out larders, corner carousel units, and drawer-based (rather than cupboard-based) storage all make better use of available space than standard cupboards, but need planning into the layout from the start rather than added afterwards. Worth discussing storage needs before finalising unit choices.
Planning bin storage properly
Built-in pull-out bin drawers, sized for recycling separation, are far easier to plan into a layout during a refit than to add afterwards — worth deciding on bin capacity and separation needs (general waste, recycling, food waste) before cabinet layout is finalised, not after.
Kitchens as part of a wider extension
A kitchen fitted as part of a house extension needs closer coordination between the builder and kitchen fitter on timing — services (electrics, plumbing, ventilation ducting) need to be roughed in during the build phase, before the kitchen fitter's own first-fix stage begins.