Common roofing jobs
Roofers handle full re-roofs, repairs to individual slipped or cracked tiles, flat roof replacement, guttering, fascias and soffits, and leadwork around chimneys and roof valleys. Emergency work — storm damage, a leak during heavy rain — is usually handled separately from planned re-roofing.
Roofing regulations, FAQ
Do I need planning permission for a new roof? Usually not for like-for-like replacement, but altering the roofline, adding a dormer, or working on a listed building often does. Do I need Building Regulations sign-off? Yes for most re-roofing work involving insulation changes — a competent roofer will handle or advise on this.
What a good roofing quote should include
A proper quote should specify materials (tile type, felt/underlay grade), whether scaffolding is included or separate, what happens to existing timbers if they're found to be rotten once work starts, and the guarantee length on both materials and workmanship.
Seasonal roof checks worth doing
Before winter: check for loose tiles and clear gutters, since blocked gutters and ice are a common combination for damage. After a storm: a visual check from the ground for obvious damage, before assuming everything's fine just because there's no visible leak yet.
Roof insulation, where it goes
Loft insulation (laid flat, cheap, effective) is different from insulating the roof slope itself (needed if the loft is being converted into living space). A re-roof is often the most cost-effective time to upgrade roof-level insulation, since the covering is already off.
Scaffolding — why it's often a separate cost
Scaffolding is frequently quoted separately from the roofing work itself, priced by roof height, access and how long it's needed. For a small repair some roofers use a tower or ladder instead, but anything involving a full re-roof or significant chimney work usually needs full scaffolding for safety and building regulations reasons.
What affects the cost
Cost depends on roof size and pitch (steeper roofs need more scaffolding and take longer), the material (slate costs more than concrete tile), access, and whether the existing roof structure (timbers, felt) needs work too, not just the visible covering. A straightforward repair is quick; a full re-roof including scaffolding commonly takes 1-3 weeks.
Roofing on extensions and new builds
A new roof needs to tie into the existing structure correctly at the junction — a common source of leaks on extensions is poor detailing at exactly this point, not the new roof covering itself. Timing roofing work before internal trades start avoids water damage to work done underneath.