Garden drainage and irrigation
Poor drainage (waterlogging after rain, a consistently boggy patch) is often fixable with a French drain or soakaway rather than needing a full garden regrade — worth getting properly diagnosed before assuming the whole garden needs releveling. Irrigation systems are more relevant for larger gardens or specific planting that needs consistent watering.
Composting and garden waste management
A compost bin reduces garden waste and improves soil over time, but needs a reasonable balance of "green" (grass clippings, food waste) and "brown" (dead leaves, cardboard) material to work well — too much of one slows the process down considerably.
Regular maintenance vs one-off visits
A maintenance contract (fortnightly or monthly visits) usually works out cheaper per visit than booking one-off gardening, and means a gardener gets to know the specific garden over time. One-off visits suit gardens that need less frequent attention or where needs vary a lot seasonally.
Understanding the labour vs materials split
For hard landscaping, materials (paving, decking, fencing) are often a large share of cost, but groundwork labour (excavation, base preparation, drainage) matters just as much for how the finished job performs. A cheap quote is worth checking against the same material spec and base preparation as competing quotes.
Common gardening and landscaping jobs
Gardeners cover a wide range, from regular maintenance (mowing, hedge trimming, weeding) to one-off landscaping projects like patios, decking, fencing and full garden redesigns. It's worth checking whether a gardener does both, since some specialise in maintenance only and subcontract larger landscaping work.
Raised beds and vegetable gardens
Raised beds improve drainage and soil quality control, useful where existing soil is poor or compacted, and make gardening more accessible for anyone who finds ground-level bending difficult. Positioning for sun exposure matters more for a productive vegetable bed than for purely ornamental planting.
Garden lighting, planning it properly
Outdoor lighting needs weatherproof (IP-rated) fittings and, for anything beyond simple solar lights, a qualified electrician for the wiring — this crosses into notifiable electrical work under Part P if it involves a new circuit. Worth planning cable routes during any hard landscaping work, not after paving is laid.
Accessible garden design
Level or gently sloped paths, raised beds, and wider gateways make a garden more usable for anyone with mobility considerations — worth planning these into a redesign from the start, since retrofitting accessibility into an already-completed hard landscaping scheme is more disruptive and costly.