Making corner units actually usable
A standard corner cabinet often wastes significant depth unless fitted with a proper carousel or pull-out mechanism — worth specifying this upfront rather than accepting a basic corner unit by default, since retrofitting a carousel mechanism later usually isn't practical.
How long does a kitchen refit take?
A worktop or door replacement is usually a day or two. A full kitchen refit including new units, worktop and appliance connections commonly takes 1-3 weeks — worth planning for reduced kitchen access during this time, particularly for cooking arrangements.
Kitchen condition and selling your home
A well-maintained, reasonably modern kitchen is one of the strongest factors in buyer appeal, and any electrical certification from work done during a refit is worth keeping for buyers' solicitors. A dated or poorly maintained kitchen is one of the most common things buyers plan to immediately replace.
Kitchen fitting in older properties
Older properties sometimes have uneven floors and walls, or original chimney breasts and alcoves that affect standard unit layouts — a fitter working on a period property will usually survey these carefully before quoting, since standard-width units don't always fit cleanly into non-standard spaces.
Knocking through for an open-plan kitchen
Removing a wall between a kitchen and adjoining room to create an open-plan space is a structural job, not just a kitchen fitting one — it needs a structural engineer's assessment and, if the wall is load-bearing, a supporting beam, plus building control sign-off. This is usually coordinated with, not done by, the kitchen fitter directly.
Planning bin storage properly
Built-in pull-out bin drawers, sized for recycling separation, are far easier to plan into a layout during a refit than to add afterwards — worth deciding on bin capacity and separation needs (general waste, recycling, food waste) before cabinet layout is finalised, not after.
Gas hobs need a Gas Safe engineer
Installing or moving a gas hob is gas work, same as a boiler, and legally needs a Gas Safe registered engineer, not just a kitchen fitter or general plumber. If you're switching from electric to gas (or vice versa) as part of a refit, this needs coordinating separately from the general fitting work.
Kitchen lighting layers
A well-lit kitchen usually combines general ceiling lighting, task lighting (under-cabinet lights over worktops, where most food prep happens), and sometimes accent lighting — a single central ceiling light alone often leaves worktops in shadow. Worth planning lighting circuits before, not after, unit installation.