What's involved in a bathroom refit
A full bathroom refit usually means removing the old suite, checking and often replacing the pipework behind it (since it's rarely accessible again once tiled over), first-fix plumbing before tiling, then second-fix (taps, shower, toilet cistern) once the room is finished. Waterproofing (tanking) around a shower area is a step worth confirming is included, not assumed.
Common plumbing myths, busted
"A dripping tap is just cosmetic" — left long enough it wastes real water and can damage the fitting further. "Any handyman can fit a boiler" — boiler work involving gas connections legally needs a Gas Safe engineer, not just a plumber. "Bleeding a radiator fixes all heating faults" — it only helps with trapped air, not pressure or pump issues.
Plumbing in older and period properties
Older properties sometimes still have lead or galvanised steel pipework, which can affect both water quality and pressure, and original layouts weren't designed around modern demand for multiple bathrooms. A plumber working on a period property will often check what the existing pipework is made of before quoting for anything beyond a like-for-like repair.
Common plumbing jobs
Plumbers handle everything from a dripping tap to a full bathroom re-pipe: fixing leaks, clearing blocked drains, replacing taps and valves, fitting new bathroom suites, repairing or replacing radiators, and connecting appliances like washing machines and dishwashers. Emergency work (burst pipes, no hot water) is usually handled separately from planned jobs like a bathroom refit.
Understanding the labour vs materials split
Materials — pipework, fittings, a new boiler or bathroom suite — are often a smaller share of a plumbing quote than labour, particularly for jobs involving lifting floors or chasing walls. If a quote looks unusually cheap, check whether it specifies the same brand/quality of fittings as a competing quote, not just a lower labour rate.
Combi vs system vs conventional boilers
A combi boiler heats water on demand with no separate tank, suits smaller properties with one bathroom. A system boiler uses a hot water cylinder but no cold water tank, better for higher demand. A conventional (regular) boiler uses both a cylinder and a tank, common in older properties and useful where mains pressure is poor.
How long does plumbing work take?
A tap or valve replacement is usually under an hour. A full bathroom refit commonly takes 5 to 10 working days depending on scope, plus time for tiling and decorating that isn't part of the plumbing work itself. A boiler swap is typically a one-day job if it's a straightforward like-for-like replacement.
First fix and second fix plumbing
On a new build or extension, "first fix" is running pipework through walls and floors before they're closed up; "second fix" is fitting the visible taps, radiators and appliances once decorating is done. Timing this with other trades on site matters — pipework needs to be pressure-tested before it's covered over, not after.