Roofing on extensions and new builds
A new roof needs to tie into the existing structure correctly at the junction — a common source of leaks on extensions is poor detailing at exactly this point, not the new roof covering itself. Timing roofing work before internal trades start avoids water damage to work done underneath.
Understanding the labour vs materials split
Materials (tiles, felt, leadwork, scaffolding hire) are often a smaller share of a re-roof quote than labour, particularly given the time and access involved. A cheap quote is worth checking for the same tile/material spec as competing quotes, not just a lower labour day rate.
Leadwork around chimneys and valleys
Lead flashing seals the joins where a roof meets a chimney, wall, or valley — a very common source of leaks when it perishes or is poorly installed, even if the roof tiles themselves are fine. If a leak keeps recurring in the same spot near a chimney, it's often the leadwork rather than the tiles that needs attention.
How roofing quotes work
An initial estimate can be given from photos or a description, but a firm price for anything beyond a very small repair usually needs the roofer to inspect the roof in person, often from the ground with binoculars or a drone rather than climbing up for a quote visit.
Roof orientation and solar suitability
A south-facing roof slope generally gets the most useful sun for solar panels, though east/west-facing roofs can still work reasonably well. A roofer or solar installer assessing suitability will look at pitch, orientation, shading from nearby trees or buildings, and roof structural capacity together.
What affects the cost
Cost depends on roof size and pitch (steeper roofs need more scaffolding and take longer), the material (slate costs more than concrete tile), access, and whether the existing roof structure (timbers, felt) needs work too, not just the visible covering. A straightforward repair is quick; a full re-roof including scaffolding commonly takes 1-3 weeks.
Common roofing jobs
Roofers handle full re-roofs, repairs to individual slipped or cracked tiles, flat roof replacement, guttering, fascias and soffits, and leadwork around chimneys and roof valleys. Emergency work — storm damage, a leak during heavy rain — is usually handled separately from planned re-roofing.
Roofing considerations before fitting solar panels
If a roof needs re-covering within the next 5-10 years, it's usually more cost-effective to do that before fitting solar panels rather than after, since removing and refitting panels for a later re-roof adds cost. Worth asking a roofer to assess roof condition before committing to solar installation timing.