How many quotes should you get?
Three is reasonable for most kitchen jobs. For a full refit, make sure each quote specifies the same unit range and worktop material, since kitchen quotes vary enormously based on spec assumptions that aren't always stated clearly upfront.
Choosing a worktop material
Laminate is the budget-friendly option and has improved significantly in appearance. Wood/laminate needs more care around water exposure near sinks. Stone (granite, quartz) is durable and heat-resistant but costs considerably more and is usually templated and fitted by a specialist worktop company, not the kitchen fitter directly.
Background checks and identity verification
Since kitchen fitting isn't gated by a single mandatory certification, checking trading history, a verifiable business address, and reviews referencing specific completed jobs matters more here than for trades with a clear registration body.
Kitchen flooring options
Vinyl and laminate are budget-friendly and reasonably water-resistant. Porcelain tile is more durable and higher-end but needs a sound, flat subfloor. Engineered wood looks warmer but needs more care around water near the sink and dishwasher — worth weighing durability against look for how the kitchen is actually used.
What a good kitchen quote should include
A proper quote should specify unit and worktop brand/spec (not just "units, worktop"), whether appliances are supplied or just fitted, whether electrical and plumbing work is covered directly or subcontracted, and what happens if hidden issues are found once old units are removed.
Common kitchen fitting jobs
Kitchen fitters handle everything from a single worktop or cupboard door replacement to a full gut-and-refit: removing old units, fitting new cabinetry, worktops, and coordinating the plumbing and electrical work a kitchen needs (sink, dishwasher, oven, extractor). Many fitters manage the whole job and bring in a plumber or electrician for specific parts.
Kitchen regulations, FAQ
Do I need building control sign-off for a kitchen refit? Usually not for a like-for-like layout, but new electrical circuits need a registered electrician's certification, handled as part of that work. Can I fit my own units? Yes, unit fitting itself isn't regulated — it's the electrics and plumbing behind it that are.
Planning bin storage properly
Built-in pull-out bin drawers, sized for recycling separation, are far easier to plan into a layout during a refit than to add afterwards — worth deciding on bin capacity and separation needs (general waste, recycling, food waste) before cabinet layout is finalised, not after.