Electrics in kitchens — circuits for appliances
A kitchen refit usually means new dedicated circuits for higher-draw appliances (oven, hob, dishwasher) rather than sharing a single ring main, plus RCD protection for anywhere near a sink. If you're changing the kitchen layout, plan socket and circuit positions before the units go in — moving them afterwards means lifting worktops or units again.
Satisfaction and aftercare — support beyond the job
A registered electrician's paperwork doesn't end when the job does — you should receive a Building Regulations compliance certificate (for notifiable work) or an Electrical Installation Certificate, which you'll need if you sell the property or make an insurance claim. Keep this with your household paperwork.
Garage and workshop power
Running power to a detached garage or workshop means an armoured cable, usually buried, and its own consumer unit or sub-board with RCD protection at the supply end. If you're planning to run power tools or an EV charger from it, size the supply for that from the start — upgrading later usually means digging the cable run up again.
Single phase vs three phase supply
Most UK homes run on a single-phase electricity supply, which is enough for typical household use. Larger properties, workshops, or homes adding multiple EV chargers or heavy machinery sometimes need a three-phase supply instead — this is arranged with the network operator, not just your electrician, and can take weeks.
Understanding the labour vs materials split
Materials — consumer units, cabling, sockets, fittings — are usually a smaller share of an electrical quote than labour, particularly for jobs involving lifting floors or chasing walls. If a quote seems unusually cheap, check whether it's using a lower-spec consumer unit or cabling than a competing quote, not just a lower labour rate.
New build and extension electrical work
Wiring an extension or new build from scratch is different from rewiring an existing room — it's planned around final wall positions and fittings before plastering, so timing with your builder matters. First-fix electrical work (cabling inside walls) has to happen before plastering; second-fix (sockets, switches, fittings) after.
Workmanship guarantees on electrical work
Registered electricians typically offer a workmanship guarantee separate from any manufacturer's warranty on parts like consumer units or EV chargers — usually 12 months upwards. Ask what's covered specifically: a guarantee on a rewire should cover the whole job, not just the final connection.
Background checks and identity verification
Before comparing quotes, it's worth checking an electrician's identity and trading history, not just their qualifications — a registration number, a landline or verifiable business address, and reviews that reference specific jobs are all better signals than a mobile number alone.