Three steps to hiring the right driveway installer
First, ask to see photos of completed local jobs, ideally a few years old so you can see how the material has worn. Second, ask specifically about base preparation depth and method. Third, get a written quote covering groundwork, drainage and edging, not just the surface material.
How long does driveway installation take?
A small driveway resurfacing is often 1-2 days. A full new driveway including excavation, base preparation and surfacing commonly takes 3-7 days depending on size and material — resin and block paving generally take longer than tarmac for the same area.
How driveway quotes work
Describe the current driveway (if any), desired material, and rough size — an initial estimate can follow, but a firm quote needs a site visit to assess ground condition, drainage, and access, since these significantly affect groundwork cost beyond the visible surface material.
What affects the cost
Cost depends on material, driveway size, ground condition (excavation and disposal if the existing surface needs removing), drainage requirements, and access for machinery and material delivery. A driveway on a slope or with poor existing drainage costs more due to the groundwork involved, not just the surface material.
What a good driveway quote should include
A proper quote should specify material and base depth/preparation (not just "block paving" or "tarmac"), whether excavation and disposal of the old surface is included, drainage provision, and edging details. Base preparation quality affects the driveway's lifespan more than most people expect.
Planning driveway width for parking
A single-width driveway needs roughly 2.4-3 metres to comfortably park and access one car; a double driveway for two cars side by side needs closer to 4.8-5.5 metres. Worth planning width around actual vehicle size and how many cars need to park, not just available space.
Planning for EV charging during driveway work
If you might install an EV charger in future, it's worth having ducting laid during driveway groundwork even if the charger itself comes later — running a cable duct under a finished surface afterwards is a much bigger, more disruptive job than including it during the original installation.
Driveway colour and finish options
Block paving and resin both come in a range of colours and finishes — beyond personal preference, a lighter colour shows dirt and staining more readily than darker options, worth considering for a low-maintenance preference alongside how it complements the property's exterior.