Electrical safety for holiday lets and Airbnbs
If you let a property short-term, insurers and booking platforms increasingly expect an in-date EICR and PAT-tested appliances, even though it isn't a blanket legal requirement the way it is for standard tenancies. Treat it the same as a rental for safety purposes — guests have less familiarity with the property than an owner-occupier would.
Smart meters and electrical work
If you're having a consumer unit replaced or a major rewire, it's worth telling your energy supplier in advance — work on the supply side sometimes needs the meter isolated by the network operator, not just your electrician, and this can take longer to arrange than the electrical work itself.
Background checks and identity verification
Before comparing quotes, it's worth checking an electrician's identity and trading history, not just their qualifications — a registration number, a landline or verifiable business address, and reviews that reference specific jobs are all better signals than a mobile number alone.
Understanding the labour vs materials split
Materials — consumer units, cabling, sockets, fittings — are usually a smaller share of an electrical quote than labour, particularly for jobs involving lifting floors or chasing walls. If a quote seems unusually cheap, check whether it's using a lower-spec consumer unit or cabling than a competing quote, not just a lower labour rate.
Electrical safety for landlords
Since 2020, landlords in England must have an EICR carried out every 5 years and provide a copy to tenants. Failing to do so can result in a fine of up to £30,000. If an EICR flags unsatisfactory work, it has to be fixed within 28 days or a shorter period the report specifies.
Electrics in kitchens — circuits for appliances
A kitchen refit usually means new dedicated circuits for higher-draw appliances (oven, hob, dishwasher) rather than sharing a single ring main, plus RCD protection for anywhere near a sink. If you're changing the kitchen layout, plan socket and circuit positions before the units go in — moving them afterwards means lifting worktops or units again.
Electrical adaptations for accessibility
Lowering socket heights, adding lighting controls that don't need fine dexterity, and wiring in advance for a stairlift or hoist are common accessibility adaptations. Planning the electrical work alongside any wider accessibility renovation avoids re-opening walls or floors that were only just closed up.
Rewiring a listed or period property
Listed building consent can be needed for chasing cable runs into original plaster or masonry, even though the electrical work itself is assessed the same way as any other property under Part P. Conduit and surface-mounted cabling are sometimes used instead of chasing into walls specifically to avoid this — worth discussing with an electrician who's worked on listed properties before.