How often should wiring be tested?
The IET recommends an electrical inspection every 10 years for an owner-occupied home, 5 years for a rented property, and on change of occupancy for some property types. A periodic inspection is different from routine maintenance — it's a formal check against current wiring regulations, not just a visual look.
Powering a garden office or outbuilding
Running power to a garden office or outbuilding usually means an armoured cable buried below the recommended depth, its own small consumer unit, and RCD protection at the supply end. This is notifiable work and typically needs building control sign-off alongside the electrical certification.
Understanding the labour vs materials split
Materials — consumer units, cabling, sockets, fittings — are usually a smaller share of an electrical quote than labour, particularly for jobs involving lifting floors or chasing walls. If a quote seems unusually cheap, check whether it's using a lower-spec consumer unit or cabling than a competing quote, not just a lower labour rate.
How many quotes should you get?
Three is the usual recommendation — enough to spot an outlier (too cheap or too expensive) without asking so many tradespeople to survey your property that it wastes everyone's time. Make sure each quote is for the same scope of work, since a lower price sometimes just means less is included.
How electrician quotes work
Describe the job, including property type, access, and whether the work is notifiable if you know. Electricians use this to give an initial estimate, then confirm the final price after seeing the job in person — particularly for anything involving old wiring, where the scope can change once cables are exposed.
Common electrical jobs
Electricians handle everything from minor repairs to full rewires: replacing a consumer unit to meet current wiring regulations, adding or moving sockets and light switches, installing an EV charging point, fixing faults such as tripping breakers or flickering lights, and full or partial rewires in older properties.
New build and extension electrical work
Wiring an extension or new build from scratch is different from rewiring an existing room — it's planned around final wall positions and fittings before plastering, so timing with your builder matters. First-fix electrical work (cabling inside walls) has to happen before plastering; second-fix (sockets, switches, fittings) after.
Christmas lights and extension lead safety
Overloading a single socket with extension leads and adaptors, especially outdoors or over the festive period, is one of the more common causes of a winter electrical fault. Outdoor lights need outdoor-rated (IP-rated) connectors, and it's worth having sockets checked before peak season if your property's wiring is older.