What a good electrical quote should include
A proper quote should state the scope of work, whether it's notifiable under Part P, an itemised breakdown of labour vs materials, the certificate you'll receive on completion, and how long the job is expected to take. If a quote is missing any of these, ask before agreeing to the work.
First fix and second fix, explained
On a rewire or new build, "first fix" is running cables through walls and floors before they're closed up; "second fix" is fitting sockets, switches and light fittings once decorating is done. Getting the timing right with other trades on site avoids cables being covered before they're tested.
Solar panels and battery storage wiring
Solar PV and battery storage installation is specialist work, usually done by an MCS-certified installer rather than a general electrician, and needs its own isolation switches and a compliant connection to your consumer unit. Your energy supplier and network operator also need to be notified before or after installation, depending on system size.
Electrics in kitchens — circuits for appliances
A kitchen refit usually means new dedicated circuits for higher-draw appliances (oven, hob, dishwasher) rather than sharing a single ring main, plus RCD protection for anywhere near a sink. If you're changing the kitchen layout, plan socket and circuit positions before the units go in — moving them afterwards means lifting worktops or units again.
Electrical adaptations for accessibility
Lowering socket heights, adding lighting controls that don't need fine dexterity, and wiring in advance for a stairlift or hoist are common accessibility adaptations. Planning the electrical work alongside any wider accessibility renovation avoids re-opening walls or floors that were only just closed up.
How many quotes should you get?
Three is the usual recommendation — enough to spot an outlier (too cheap or too expensive) without asking so many tradespeople to survey your property that it wastes everyone's time. Make sure each quote is for the same scope of work, since a lower price sometimes just means less is included.
What affects the cost
Cost depends on the scope of the job, how much of the property needs to be accessed, the age and condition of the existing wiring, and whether the consumer unit needs upgrading. A single socket replacement is quick and low-cost; a full rewire in an older property takes longer, partly because of the making-good work afterwards.
Three steps to hiring the right electrician
First, confirm they're registered with NICEIC or NAPIT and ask to see their registration number. Second, get a written quote that itemises labour and materials separately, not just a total. Third, ask what certificate you'll receive when the work's done — for notifiable work, you're entitled to a Building Regulations compliance certificate.