Leadwork around chimneys and valleys
Lead flashing seals the joins where a roof meets a chimney, wall, or valley — a very common source of leaks when it perishes or is poorly installed, even if the roof tiles themselves are fine. If a leak keeps recurring in the same spot near a chimney, it's often the leadwork rather than the tiles that needs attention.
What affects the cost
Cost depends on roof size and pitch (steeper roofs need more scaffolding and take longer), the material (slate costs more than concrete tile), access, and whether the existing roof structure (timbers, felt) needs work too, not just the visible covering. A straightforward repair is quick; a full re-roof including scaffolding commonly takes 1-3 weeks.
Roofing emergencies — what to do
For a leak during a storm, contain the water inside (a bucket, moving belongings) rather than attempting a repair on a wet or high-wind roof yourself. Photograph any visible damage from the ground for an insurance claim before it's repaired. Tarping over a damaged section is a common temporary fix while a full repair is arranged.
Skylights and roof windows
Adding a skylight to an existing roof means cutting into the structure and properly flashing around the new opening — a common source of future leaks if not done to the window manufacturer's fitting instructions exactly. Existing roof pitch and rafter spacing affect what size window can go where.
Common roofing jobs
Roofers handle full re-roofs, repairs to individual slipped or cracked tiles, flat roof replacement, guttering, fascias and soffits, and leadwork around chimneys and roof valleys. Emergency work — storm damage, a leak during heavy rain — is usually handled separately from planned re-roofing.
What a roof survey actually checks
A proper roof survey looks beyond the visible tiles — timber condition in the loft, flashing around chimneys and valleys, ventilation, and signs of past repairs. Worth requesting one before buying a property with an older roof, since problems aren't always visible from ground level or even from inside the loft.
Flat roof vs pitched roof considerations
Flat roofs (felt, GRP fibreglass, or rubber/EPDM) typically need replacing more often than a pitched tiled roof, but repairs are usually quicker and cheaper. A flat roof extension on an older pitched-roof property is common and often uses a different material and roofer specialism than the main roof.
Roofing regulations, FAQ
Do I need planning permission for a new roof? Usually not for like-for-like replacement, but altering the roofline, adding a dormer, or working on a listed building often does. Do I need Building Regulations sign-off? Yes for most re-roofing work involving insulation changes — a competent roofer will handle or advise on this.