New build and extension electrical work
Wiring an extension or new build from scratch is different from rewiring an existing room — it's planned around final wall positions and fittings before plastering, so timing with your builder matters. First-fix electrical work (cabling inside walls) has to happen before plastering; second-fix (sockets, switches, fittings) after.
Solar panels and battery storage wiring
Solar PV and battery storage installation is specialist work, usually done by an MCS-certified installer rather than a general electrician, and needs its own isolation switches and a compliant connection to your consumer unit. Your energy supplier and network operator also need to be notified before or after installation, depending on system size.
Tripping fuses or flickering lights? Common causes
A breaker that trips repeatedly usually means a fault on a specific circuit, not the consumer unit itself — an electrician can isolate which circuit is affected. Flickering lights are often a loose connection rather than a faulty bulb, and worth having checked rather than ignored, particularly in older wiring.
Workmanship guarantees on electrical work
Registered electricians typically offer a workmanship guarantee separate from any manufacturer's warranty on parts like consumer units or EV chargers — usually 12 months upwards. Ask what's covered specifically: a guarantee on a rewire should cover the whole job, not just the final connection.
Electrical safety for landlords
Since 2020, landlords in England must have an EICR carried out every 5 years and provide a copy to tenants. Failing to do so can result in a fine of up to £30,000. If an EICR flags unsatisfactory work, it has to be fixed within 28 days or a shorter period the report specifies.
How electrician quotes work
Describe the job, including property type, access, and whether the work is notifiable if you know. Electricians use this to give an initial estimate, then confirm the final price after seeing the job in person — particularly for anything involving old wiring, where the scope can change once cables are exposed.
What a good electrical quote should include
A proper quote should state the scope of work, whether it's notifiable under Part P, an itemised breakdown of labour vs materials, the certificate you'll receive on completion, and how long the job is expected to take. If a quote is missing any of these, ask before agreeing to the work.
First fix and second fix, explained
On a rewire or new build, "first fix" is running cables through walls and floors before they're closed up; "second fix" is fitting sockets, switches and light fittings once decorating is done. Getting the timing right with other trades on site avoids cables being covered before they're tested.