Smart meters and electrical work
If you're having a consumer unit replaced or a major rewire, it's worth telling your energy supplier in advance — work on the supply side sometimes needs the meter isolated by the network operator, not just your electrician, and this can take longer to arrange than the electrical work itself.
Do I need an electrical certificate to sell my house?
There's no legal requirement to provide one, but conveyancing solicitors routinely ask whether any electrical work done during your ownership was certified, and a missing certificate for notifiable work (a rewire, a consumer unit change, a kitchen or bathroom circuit) can hold up or complicate a sale. Keep any Electrical Installation or Building Regulations certificates with your house paperwork.
What is an EICR and do I need one?
An Electrical Installation Condition Report checks a property's wiring against current safety standards and flags anything worn, damaged or non-compliant. Landlords are legally required to get one every 5 years; homeowners aren't, but it's worth having on an older property or one you've just bought where the wiring history is unknown.
What affects the cost
Cost depends on the scope of the job, how much of the property needs to be accessed, the age and condition of the existing wiring, and whether the consumer unit needs upgrading. A single socket replacement is quick and low-cost; a full rewire in an older property takes longer, partly because of the making-good work afterwards.
How electrician quotes work
Describe the job, including property type, access, and whether the work is notifiable if you know. Electricians use this to give an initial estimate, then confirm the final price after seeing the job in person — particularly for anything involving old wiring, where the scope can change once cables are exposed.
Electrical safety for holiday lets and Airbnbs
If you let a property short-term, insurers and booking platforms increasingly expect an in-date EICR and PAT-tested appliances, even though it isn't a blanket legal requirement the way it is for standard tenancies. Treat it the same as a rental for safety purposes — guests have less familiarity with the property than an owner-occupier would.
Lighting design and circuit planning
Adding recessed downlights, under-cabinet lighting or dimmer circuits usually means new cabling even if you're keeping the existing consumer unit, since older lighting circuits weren't sized for LED transformers or multiple dimmer switches. Plan lighting changes before, not after, a room's redecorated.
How long does electrical work take?
A socket or switch swap is usually under an hour. A consumer unit replacement is typically a full day, often with the power off for several hours. A full rewire in an occupied property commonly takes 5 to 10 days depending on size and access, plus time afterwards for plastering and redecorating that isn't part of the electrical work itself.