Common driveway and paving jobs
Driveway specialists cover new driveway installation (block paving, tarmac, resin, gravel), resurfacing an existing driveway, paths, and kerb dropping to create vehicle access from a road. Repairs to cracked or sunken sections are usually a smaller, separate job from a full installation.
Background checks and identity verification
Driveway and paving work has historically had more than its share of doorstep cold-calling, particularly for tarmac and resurfacing — checking trading history, a verifiable business address, and reviews referencing specific local jobs matters more here than for some other trades.
Resin bound vs block paving driveways
Resin bound gives a smooth, seamless, low-maintenance surface with good permeability, but relies heavily on the quality of the base preparation underneath — a poorly prepared base is the most common cause of resin surface problems. Block paving is more forgiving of minor settlement since individual blocks can be lifted and relaid.
Driveway edging options
Edging (block paving kerbs, concrete edging, or a contrasting material border) contains the main surface and gives a more finished look — resin and gravel driveways particularly benefit from solid edging to stay contained and prevent material migrating onto lawns or paths over time.
Kerb dropping, what's involved
Creating a new vehicle crossing over a public footpath (a dropped kerb) needs permission from your local council's highways department, not just your driveway installer — this is a separate legal process from the driveway work itself and needs to be arranged before or alongside the physical installation.
Three steps to hiring the right driveway installer
First, ask to see photos of completed local jobs, ideally a few years old so you can see how the material has worn. Second, ask specifically about base preparation depth and method. Third, get a written quote covering groundwork, drainage and edging, not just the surface material.
How long does driveway installation take?
A small driveway resurfacing is often 1-2 days. A full new driveway including excavation, base preparation and surfacing commonly takes 3-7 days depending on size and material — resin and block paving generally take longer than tarmac for the same area.
Red flags in a cheap driveway quote
A quote well below others is worth real scrutiny — check it includes proper excavation and base preparation, not just a thin surface layer over existing ground. Doorstep cold-calling, pressure to decide immediately, and cash-only payment are all worth treating with particular caution in this trade.